− | * Went over the minutes from the last meeting
| |
− | * Significant discussion on shims -
| |
− | ** Malte has a large number of SS straps from the original modules and will serve as the shims to make up for the difference in module orientation of the lead glass blocks
| |
− | ** Matt Shepherd brought addition SS strap and shim material
| |
− | ** The original stack up used shims at each step so we should have plenty to reuse if needed
| |
− | ** Discussed shimming the glass/crystal interface to get good and straight, maybe a sheet all around to give a flat surface for the crystals? Also a conductive rubber pad?
| |
− | *** Sasha said the conductive rubber pad on the ComCal is coming apart so we would have to find something more robust.
| |
− | *** Sasha will come up with a stacking sequence for crystals and develop shimming plan for crystals
| |
− | * Talked about squeezing one glass module row at a time to ensure we get a proper stack - this can be done and the left plate is loosened to allow the next row
| |
− | ** If we wish to squeeze the beam right glass modules (1 row at a time) to set up vertical interface with crystals, we can do that with a tool before the crystals (2 rows) are installed
| |
− | ** The center left cooling plate is being cut into 3 pieces to make it more manageable
| |
− | * Malted stated that the existing signal cables will all be removed by today - we can remove chains in the morning
| |
− | * We should be ready to pull cables out of dark room next week. Unstacking may start the following week
| |
− | * Discussed where rtd's go. 10 total on crystals some near center and edges US and DS flanges
| |
− | * Discussed supporting the lead glass module flange above the crystals on the DS end
| |
− | ** May interfere with cabling the crystal bases
| |
− | ** Glass modules have housing DS that is smaller than the glass - all load would be put into the first layer joint
| |
− | ** both glass and crystal modules are designed to be supported by the glass/crystal
| |
− | ** Glass Module CG is over crystal so it should be ok
| |
− | ** Cannot support from end of glass module as housing is plastic
| |
− | * Sasha updated that cables are on order
| |
− | * Sasha stated that he ordered 200 silicon cookies that match original glass module parameters
| |
− | * Malte stated that he has spares of the PeeK threaded rods for the glass modules
| |
− | * Malte will practice rewrapping of the modules as Matt has brought the fixture and some cut aluminized Mylar
| |
− | * Discussion ensued on the Light Monitoring system - stll no decision on the design and method. We will have a separate meeting
| |
− | ** Time is getting short if we do not wish to hold up the assembly waiting for parts. Need to decide ASAP
| |
− | * As found measurements of existing lead glass stack up [[Media:FCAL_module_stack.pdf]]
| |
− | ** The detector was measured from the outside of the aluminum plates that hold in the modules
| |
− | ** Subtract 18.16mm from beam left to take out plate and shim thickness
| |
− | ** Subtract 19.69 mm from beam right
| |
− | ** Subtract 20.19mm from top
| |
− | ** Subtract 16.13mm from bottom
| |
− | ** Bottom line, the vertical stack is 1.37 mm higher than the expected value and .62 mm wider over 59 modules
| |
− | ** Lower half is .66mm more than upper half
| |
− | ** Beam left is .43mm more than BR
| |
− | ** This may be due to shims being used. We will see when we take it apart
| |