Difference between revisions of "Distribution of signals and voltages"
From GlueXWiki
Line 6: | Line 6: | ||
[[ Patch panels and cables]] | [[ Patch panels and cables]] | ||
− | + | <!-- | |
<gallery> | <gallery> | ||
Image:fcal_dr1.jpg | Fig. 1 Chains in the FCAL dark room | Image:fcal_dr1.jpg | Fig. 1 Chains in the FCAL dark room | ||
Line 13: | Line 13: | ||
Image:fcal_dr4.jpg | Fig. 4 Vent outside the dark box on the door side | Image:fcal_dr4.jpg | Fig. 4 Vent outside the dark box on the door side | ||
</gallery> | </gallery> | ||
− | + | --> | |
[https://halldweb.jlab.org/detectors/fcal2/cables/hv_distribution High Voltage Cables] | [https://halldweb.jlab.org/detectors/fcal2/cables/hv_distribution High Voltage Cables] |
Revision as of 18:44, 1 May 2023
Original layout the distribution boards and cables
Proposed distribution of signal and LV cables inside the FCAL dark room