Difference between revisions of "September 10, 2024 KLONG CPS Design Meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 14: | Line 14: | ||
** [[media:CPS Absorber Prototype test v4.pdf | CPS Absorber Prototype Test]] | ** [[media:CPS Absorber Prototype test v4.pdf | CPS Absorber Prototype Test]] | ||
* Beamline upstream of magnet | * Beamline upstream of magnet | ||
+ | ** 370um beryllium window with 4.5" flange available - | ||
+ | ** Collimator layout | ||
+ | ** Magnetic shielding | ||
* Lead brick painting is 60% done and all due back in October | * Lead brick painting is 60% done and all due back in October | ||
+ | ** Additional 1200 painted lead bricks in PR system | ||
* DeGauss test - | * DeGauss test - | ||
* Working on ANSYS transient thermal and FLUENT/CFX models | * Working on ANSYS transient thermal and FLUENT/CFX models |
Revision as of 11:34, 10 September 2024
Meeting Time and Place
Tuesday, September 10, 2024, 1:00pm Hall D Counting House
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard
Agenda
- Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/August_13,_2024_KLONG_CPS_Design_Meeting
- FSD Detector
- Power supply status -
- Magnet update (Josh/Stephanie)
- Copper cooling update -
- Beamline upstream of magnet
- 370um beryllium window with 4.5" flange available -
- Collimator layout
- Magnetic shielding
- Lead brick painting is 60% done and all due back in October
- Additional 1200 painted lead bricks in PR system
- DeGauss test -
- Working on ANSYS transient thermal and FLUENT/CFX models
Minutes
- Hovanes presented a baseline for FSD channel requiremnents - good start, we need to follow up to solidify
- Power supply order on track - Feb/March delivery
- Magnet Update - PR written
- CPS absorber shielding in work
- Copper cooling - looking at test piece and comparing models (CFX and Thermal) with and without indium layer
- Discussed the beamline upstream of the magnet -
- collimator and FSD detector needed as well as a beryllium window and mag shielding for beamline
- Hovanes and Josh looking at stray fields upstream of magnet
- Tim seeing what beryllium window he has in his office
- Stephanie laying out collimator, window, FSD detector
- Absorber shielding being looked at, will meet with Pavel to discuss options
- Lead brick painting on track
- Tim to work with Onish and Joe Meyers to develop deGauss test