Difference between revisions of "Coil Test Weekly Meeting 10-Dec-2009"
From GlueXWiki
m |
m |
||
Line 14: | Line 14: | ||
* Bigger door in F117 - Tom | * Bigger door in F117 - Tom | ||
* Use one PLC chassis for two coils? - Scot | * Use one PLC chassis for two coils? - Scot | ||
− | * | + | * Should we have manual valves in control system? - Elliott, Scot, George |
+ | * Which control operations should be automated, which should be done manually? - All | ||
+ | * Moving power supply dump resistor - Mark S | ||
* Update on Hall C PLC failure and redundant PLC's - Elliott | * Update on Hall C PLC failure and redundant PLC's - Elliott | ||
* A-B Point I/O system for RS232 channels and other applications - Elliott | * A-B Point I/O system for RS232 channels and other applications - Elliott |
Revision as of 13:04, 9 December 2009
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 10-Dec-2009 9:45 am ARC 428
Agenda
- Controls narrative and P&I meeting - Mark W
- FastTrack schedule status - George, Chuck
- QWeak area - Tom
- Bigger door in F117 - Tom
- Use one PLC chassis for two coils? - Scot
- Should we have manual valves in control system? - Elliott, Scot, George
- Which control operations should be automated, which should be done manually? - All
- Moving power supply dump resistor - Mark S
- Update on Hall C PLC failure and redundant PLC's - Elliott
- A-B Point I/O system for RS232 channels and other applications - Elliott
- Armen to begin wiring effort in F117 - Scot, Elliott
- Status of interface to cryo can - George
- Status of pressure relief system design - George
- Status of ordering cryo can - George
- Platform stand order and delivery schedule - George
- Ordering remaining controls instrumentation and components - Scot, Elliott
- PLC programming and testing - Mark W
- Coil 1 modification and testing - George
- Coil 2 cost and schedule - George
- Coil 3 statement of work, visit and IUCF contract - George, Tom
- Coil 4 controls wiring replacement - George
- Shipping rails and transportainer from IUCF - Tom
- Safety reviews: when to start formal process - George, Elliott
- 5 G contours - George
- Coil Test Top To-Do items