Difference between revisions of "May 20, 2010 Readout"
From GlueXWiki
Line 12: | Line 12: | ||
# Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference. | # Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference. | ||
− | |||
# Start a bulleted list of testing for the SiPMs (Serguey). | # Start a bulleted list of testing for the SiPMs (Serguey). | ||
− | # Distribution of p.e. corresponding to each sensor within the readout sum (Andrei). | + | # Distribution of p.e. corresponding to each sensor within the readout sum (Andrei). Add min and max for both upstream and downstream readouts. |
= Documents to Review= | = Documents to Review= |
Revision as of 14:25, 6 May 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
- Start a bulleted list of testing for the SiPMs (Serguey).
- Distribution of p.e. corresponding to each sensor within the readout sum (Andrei). Add min and max for both upstream and downstream readouts.
Documents to Review
- File:SiPM contracting timeline v0.pdf
- GlueX-doc-1474 BCAL Dynamic Range from the Simulation with FLUKA
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- USM MOU/contract update (Elton)
- Simulation runs
- Geometry
- SiPM Radiation Hardness Test (Yi)
- SiPM - Testing Schedules
- Light guides
Minutes
Attending: