*: [http://zeus.phys.uconn.edu/halld/tagger/design-2-2006/FF_design.dwg 3D Autocad Model of Two-Dipole Tagging Spectrometer] from Yang, Feb. 21, 2006. | *: [http://zeus.phys.uconn.edu/halld/tagger/design-2-2006/FF_design.dwg 3D Autocad Model of Two-Dipole Tagging Spectrometer] from Yang, Feb. 21, 2006. | ||
*: [[35% drawing by IHEP provided in April/May 2007]] | *: [[35% drawing by IHEP provided in April/May 2007]] | ||
− | *: | + | *:* [[Private: Suggestion on changes to the 35% drawings]] |
*: [[Statement of Work for the 100% engineering drawings]] | *: [[Statement of Work for the 100% engineering drawings]] | ||
− | *: | + | *:* [[Private: Discussion of the Statement of Work]] |
*: [http://www.jlab.org/~whitey/Hall_D/TAGGER/YANGNET.pdf Tagger magnet Cross section] from Yang Tosca Sept 10, 2008. | *: [http://www.jlab.org/~whitey/Hall_D/TAGGER/YANGNET.pdf Tagger magnet Cross section] from Yang Tosca Sept 10, 2008. | ||
*: [http://www.jlab.org/~whitey/Hall_D/TAGGER/YANGNET_PART_DEUX.pdf Tagger magnet modified Cross section] from Yang Tosca, Sept 26, 2008. | *: [http://www.jlab.org/~whitey/Hall_D/TAGGER/YANGNET_PART_DEUX.pdf Tagger magnet modified Cross section] from Yang Tosca, Sept 26, 2008. |
Revision as of 14:47, 1 June 2010
Contents
Tagging Spectrometer
- Reference drawings for the two-dipole tagger design
- 3D Autocad Model of Two-Dipole Tagging Spectrometer from Yang, Feb. 21, 2006.
- 35% drawing by IHEP provided in April/May 2007
- Statement of Work for the 100% engineering drawings
- Tagger magnet Cross section from Yang Tosca Sept 10, 2008.
- Tagger magnet modified Cross section from Yang Tosca, Sept 26, 2008.
- Tagger magnet critical interfaces sht 1, Feb. 23, 2009.
- Tagger magnet critical interfaces Sht 2, Feb. 23, 2009.
- Tagger hall Quad magnet sht 1, Mar. 1, 2009.
- Tagger hall Quad magnet sht 2, Mar. 1, 2009.
- Tagger interface drawing
- Standard Beamline Quadrupole Specification
- Tagger Preliminary drawings 10May10
- Tagger magnet prelim spec May 2010
Broadband Tagger Hodoscope
- 35% drawings produced by Catholic Univ. (5/2007)
Tagger Microscope
Active Collimator
- 100% drawings produced by Univ. of Connecticut (6/2006)
Tagger Hall
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
- Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008
- Collimator Cave Isometric Jul 18, 2008 - July 18, 2008