Difference between revisions of "Tagged Beam Group Engineering Drawings"
From GlueXWiki
(→Tagging Spectrometer) |
(→Tagging Spectrometer) |
||
Line 20: | Line 20: | ||
* Tagging Spectrometer Design | * Tagging Spectrometer Design | ||
− | |||
*: [[Media:Prelim_Hall-D_Tagger_Dipole_Magnet_Specification_4-30-2010.doc | Tagger magnet prelim spec May 2010]] | *: [[Media:Prelim_Hall-D_Tagger_Dipole_Magnet_Specification_4-30-2010.doc | Tagger magnet prelim spec May 2010]] | ||
+ | *: [[Media:Prelim_tagger_dwgs.pdf | Tagger Preliminary drawings 10May10]] | ||
==Broadband Tagger Hodoscope== | ==Broadband Tagger Hodoscope== |
Revision as of 14:50, 1 June 2010
Contents
Tagging Spectrometer
- Reference drawings for the two-dipole tagger design
- 3D Autocad Model of Two-Dipole Tagging Spectrometer from Yang, Feb. 21, 2006.
- 35% drawing by IHEP provided in April/May 2007
- Statement of Work for the 100% engineering drawings
- Tagger magnet Cross section from Yang Tosca Sept 10, 2008.
- Tagger magnet modified Cross section from Yang Tosca, Sept 26, 2008.
- Tagger Interface Design
- Tagger magnet critical interfaces sht 1, Feb. 23, 2009.
- Tagger magnet critical interfaces Sht 2, Feb. 23, 2009.
- Tagger interface drawing
- Tagger Quadrupole Design
- Tagger hall Quad magnet sht 1, Mar. 1, 2009.
- Tagger hall Quad magnet sht 2, Mar. 1, 2009.
- Standard Beamline Quadrupole Specification
- Tagging Spectrometer Design
Broadband Tagger Hodoscope
- 35% drawings produced by Catholic Univ. (5/2007)
Tagger Microscope
Active Collimator
- 100% drawings produced by Univ. of Connecticut (6/2006)
Tagger Hall
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
- Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008
- Collimator Cave Isometric Jul 18, 2008 - July 18, 2008