Difference between revisions of "For the third coil"
From GlueXWiki
m |
m |
||
Line 6: | Line 6: | ||
** eliminiate pickup on downstream lead/splice (esp. during dump) | ** eliminiate pickup on downstream lead/splice (esp. during dump) | ||
** understand induced voltages on taps during testing | ** understand induced voltages on taps during testing | ||
+ | ** switch to 20k protection resistors for coil taps? | ||
Line 18: | Line 19: | ||
* Danfysik quench detector | * Danfysik quench detector | ||
− | ** implement | + | ** implement divider circuit upstream of QD to eliminate effects of coil imbalances |
Revision as of 11:00, 10 March 2011
To-do list
- Wiring
- checkout, understand noise, signal clipping and interaction between modules
- eliminiate pickup on downstream lead/splice (esp. during dump)
- understand induced voltages on taps during testing
- switch to 20k protection resistors for coil taps?
- Danfysik power supply
- fix broken transistor
- commission fault sequencer
- understand ramp-down mechanism
- understand varying fast dump time constants
- fix slow dump
- choose ground fault detection compatible with quench detector
- Danfysik quench detector
- implement divider circuit upstream of QD to eliminate effects of coil imbalances
- Instrumentation
- ensure all devices on clean power
- check out Newport controllers, flow switch
- implement system to isolate fault detectors and determine time sequence of trips
- understand spikes on shunt Newport
- understand effect of B field on all sensors
- monitor circuit breakers?
- NI USB device
- rework Zener/divider box, needs to be fully bipolar
- eliminate noise
- A-B HMI improvements
- upgrade to 100 screen license
- implement fault sequence screens
- A-B PLC program improvements
- use custom ("add-on") instructions to simplify code
- EPICS
- EWEB screens
- update for latest tags and drawings
For the hall
- note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
- should we install a UPS on the Danfysik contactor and control boards?
- do we need additional valves, check valves, bypasses, whatever?
- do we need Dataforth voltage attenuators on coil tap channels?
- do we need active isolation of coil tap channels, etc?
- should we monitor all circuit breakers?
- should we monitor all relays?
- effect of B field on sensors/relays?