Difference between revisions of "Aug 11, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
|||
Line 2: | Line 2: | ||
# Add hardware voltage limits to bias circuit (Jack) | # Add hardware voltage limits to bias circuit (Jack) | ||
+ | # Reset devices when communication errors are encountered in control loop (Yi) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 16:46, 4 August 2011
Action Items from previous meetings
- Add hardware voltage limits to bias circuit (Jack)
- Reset devices when communication errors are encountered in control loop (Yi)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM testing (Carl and Yi)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Geometry (Elton)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
Minutes
Attending: