Difference between revisions of "Nov 8, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 32: Line 32:
  
 
=Minutes=
 
=Minutes=
''Attending:
+
''Attending: Yi, David, Tim, Beni, John, Elton (JLab); Christina (Athens); Alam, Hayk (USM); Zisis, Andrei (UofR).
  
 
# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items
 
# Monitoring.   
 
# Monitoring.   
 +
# Geometry
 +
#* Monitoring contract has been placed
 
#* [[Media:IMG 0794.JPG]]
 
#* [[Media:IMG 0794.JPG]]
 
#* [[Media:IMG 0793.JPG]]
 
#* [[Media:IMG 0793.JPG]]
 +
#* Photos show that there is room for the Bcal monitoring board.
 +
# Light guides
 +
#* Christina is unsure precisely what light guides they received from Chile.
 +
# Next steps
 +
#* Mount opposing 4 light guides (2 on each side) of miniCal to study cross talk
 +
#* Elton: Fernando has promised to order more compact electronics with summed output to make available to Athens.
 
# Beam tests in Hall B (fall 2011) (John)
 
# Beam tests in Hall B (fall 2011) (John)
 
# FCAL
 
# FCAL

Revision as of 16:16, 8 November 2011

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Regina Phone: in LB228 is 306-585-4204
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. Beam tests in Hall B (fall 2011) (John)
  5. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  6. BCAL
    1. Construction Status: builds, mini module
    2. Fibres
  7. USM update: [1]
  8. Simulations/Reconstruction
  9. Any other business

Minutes

Attending: Yi, David, Tim, Beni, John, Elton (JLab); Christina (Athens); Alam, Hayk (USM); Zisis, Andrei (UofR).

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. Geometry
  5. Light guides
    • Christina is unsure precisely what light guides they received from Chile.
  6. Next steps
    • Mount opposing 4 light guides (2 on each side) of miniCal to study cross talk
    • Elton: Fernando has promised to order more compact electronics with summed output to make available to Athens.
  7. Beam tests in Hall B (fall 2011) (John)
  8. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  9. BCAL
    1. Construction Status: builds, mini module
    2. Fibres
  10. USM update: [2]
  11. Simulations/Reconstruction
  12. Any other business