Difference between revisions of "2012 Software Review"
(→From 2011 mini-Review: add note about spreadsheet) |
|||
Line 18: | Line 18: | ||
** [https://halldsvn.jlab.org/repos/trunk/home/marki/gluex/docs/comp_mod/computing_model.xls Spreadsheet] used for estimates in Mark's talk. Cells shaded blue indicate input data. Other cells are derived from these. | ** [https://halldsvn.jlab.org/repos/trunk/home/marki/gluex/docs/comp_mod/computing_model.xls Spreadsheet] used for estimates in Mark's talk. Cells shaded blue indicate input data. Other cells are derived from these. | ||
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1782 IT in the 12-GeV Era: Chip Watsons's close-out slides] | * [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1782 IT in the 12-GeV Era: Chip Watsons's close-out slides] | ||
+ | * [[Media:Halld_offline_management_2011_Ito.pdf|Mark's response to first draft committee report]] | ||
== From 6GeV BIA Schedule == | == From 6GeV BIA Schedule == |
Revision as of 13:55, 23 January 2012
Contents
Scope
The review is intended to assess the overall ability of the software to analyze the data at the time data taking begins. This was a goal that was largely considered to have been sought and achieved by the LHC experiments at CERN. This has not been done previously at JLab while commissioning a new experimental hall.
Original e-mails sent by Rolf and Eugene initially describing the scope can be found here:
- Initial description of purpose of 2012 Software Review.
- e-mail sent to HallD-Offline on Jan. 18, 2012
Charge
The official charge has yet to be determined
Material
From 2011 mini-Review
In Spring of 2011 an internal software review was conducted partially as preparation for the external review planned in 2012. Below are links to some of the relevant material from that review.
- Hall-D and IT: Mark Ito's slides for Hall-D
- Spreadsheet used for estimates in Mark's talk. Cells shaded blue indicate input data. Other cells are derived from these.
- IT in the 12-GeV Era: Chip Watsons's close-out slides
- Mark's response to first draft committee report
From 6GeV BIA Schedule
The 6GeV BIA (Baseline Improvement Schedule) was made to allow development on certain projects that while critical to 12GeV, could be used by the 6GeV program were it to continue and the upgrade never happen. Thus, these items were to be paid for by the 6GeV operations budget and not out of the 12GeV project budget.
The Offline Computing schedule was placed in the BIA and the intention was to track it there. At some point (2009?) the BIA tracking was dropped and the Offline Computing has not maintained tracking of it since. It does, however, serve as the most recent detailed project plan for the offline computing. The most recent version (extracted by Phil Kessler on Jan. 17, 2012) can be found here:
BIA_Last_Baseline_with_Offline_Computing_17_January_12_PMK.pdf
From 12GeV Project Schedule
The 12 GeV Project schedule contains only the Online Computing activities. Primarily DAQ system and Control Systems software. There is some overlap between the offline and online and where the reviewers will draw the boundary. Nonetheless, a recent (Oct. 2011) extraction of the Computing part of the project schedule can be found here:
12GeVProject_OnlineComputing_Oct2011.pdf
BNL Review
The following attachments were sent with the e-mail below regarding a 2006 BNL review that this may be similar to:
- Cap_charge_dec06.pdf
- CAP-Review-Agenda-18-19-December-2006.pdf
- RMP-draft.pdf
- 12_GeV_Review_Planning_Halls_Jan2012.pdf (same document circulated earlier by Rolf)
Live links to those referred to under a), b), c) below are here:
- a) http://www.bnl.gov/npp/docs/doehep07/raja_BNL-DOE.pdf
- b) http://science.energy.gov/~/media/hep/pdf/files/pdfs/lhcops_hepap_1.pdf
- c) http://gate.hep.anl.gov/lprice/USLHC_Operations_2009-final.doc
---------- Forwarded message ---------- Date: Tue, 17 Jan 2012 14:50:04 -0500 (EST) From: Rolf Ent <ent@jlab.org> To: Robert Michaels <rom@jlab.org>, John LeRose <lerose@jlab.org>, Volker Burkert <burkert@jlab.org>, Latifa Elouadrhiri <latifa@jlab.org>, Stephen A. Wood <saw@jlab.org>, Howard Fenker <hcf@jlab.org>, Eugene Chudakov <gen@jlab.org>, Elton Smith <elton@jlab.org>, Glenn Young <gyoung@jlab.org>, Graham Heyes <heyes@jlab.org>, Javier Gomez <gomez@jlab.org>, Chip Watson <watson@jlab.org> Cc: Robert McKeown <bmck@jlab.org>, Roy Whitney <whitney@jlab.org> Subject: Re: 12 GeV Software review planning - electronic Dear all, Apologies for the delay, but here a few attachments with: 1) charge and agenda for an internal BNL Atlas review in December of 2006, that Chip chaired and had a fairly large emphasis upon software and computing, as opposed to construction. 2) for completeness, the document on what to expect/prepare for a review, from the earlier meeting. 3) the research management plan for the SBS. Also, FYI here a few sites with presentations/further info that may be useful, per Chip: a) a link to a software talk from a DOE review http://www.bnl.gov/npp/docs/doehep07/raja_BNL-DOE.pdf with a pretty broad scope, and lots of details. Should be useful. b) a DOE talk of 1 1/2 years old: http://science.energy.gov/~/media/hep/pdf/files/pdfs/lhcops_hepap_1.pdf c) the annual review report from 2009 for US LHC: http://gate.hep.anl.gov/lprice/USLHC_Operations_2009-final.doc (where Operations includes software and computing). Best regards, Rolf
Hall-D Preparations
Specific plans for Hall-D's preparations for the review are gathered in this section.
Planning Meetings
Presentations
Milestones/Data challenges
Contact Info
Hall-D preparations for the review are being organized by: