Difference between revisions of "2012-03-07"
From GlueXWiki
(→Reports from Technical Groups) |
(→Beam Tests) |
||
Line 43: | Line 43: | ||
** UMass | ** UMass | ||
=== Beam Tests === | === Beam Tests === | ||
+ | |||
+ | * [https://halldweb1.jlab.org/wiki/index.php/GlueX_BeamTests FCAL & BCAL] | ||
+ | |||
=== Calibration Discussions in Working Groups === | === Calibration Discussions in Working Groups === | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === |
Revision as of 12:09, 7 March 2012
Contents
[hide]Meeting Time and Place
The meeting will be on Wednesday March 7, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room L104.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
Announcements
- Elections
- PWA Workshop at W&M
- HUGS Summer School
Reviews and Reports
- Updated 12-GeV Physics Case
- Software Review
MOU and Contract Status
- MOU Status
- ASU
- Construction Contracts
- CUA
- FIU
- FSU
- UCONN
- UMass
Beam Tests
Calibration Discussions in Working Groups
Reports from Technical Groups
- Calorimeters
- Calorimetry February 28, 2012
- BCAL Readout March 6, 2012
- Technical Design Report
- Tracking February 29, 2012
- CDC
- FDC
- Technical Design Report
- TOF March 1, 2012
- Technical Design Report
- Start Counter March 6, 2012
- Technical Design Report
- Engineering
- Magnet
- Target
- Engineering Activities
- Technical Design Report
- Electronics
- Technical Design Report
- Trigger February 1, 2012
- Technical Design Report
- DAQ/Monitoring/Controls February 29, 2012
- Technical Design Report
- Offline
- Software Meeting February 22, 2012
- Tracking Software February 29, 2012
- Technical Design Report
- Photon Beam and Tagger March 5, 2012
- Technical Design Report
- Physics February 27, 2012