Difference between revisions of "May 24, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 1: | Line 1: | ||
== Action Items from previous meetings == | == Action Items from previous meetings == | ||
− | # Determine if swapped bias pins was accidental or in design (Chris) | + | # <strike> Determine if swapped bias pins was accidental or in design (Chris) </strike> |
# Develop front and back views of jumper sheets. Also get latest version of drawings (Jack) | # Develop front and back views of jumper sheets. Also get latest version of drawings (Jack) | ||
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando) | # Check into AC units based on Peltier coolers for SiPM production tests (Fernando) | ||
− | # Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot) | + | # <strike> Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot) </strike> |
# Design tooling/procedure for making the patterns for wrapping from tedlar (Jim) | # Design tooling/procedure for making the patterns for wrapping from tedlar (Jim) | ||
# Review Fcal LED and controller monitoring boards (Fernando) | # Review Fcal LED and controller monitoring boards (Fernando) | ||
Line 25: | Line 25: | ||
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: | ||
+ | |||
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # Beam test experience (Elton) | ||
+ | # SiPM production testing (everyone) | ||
+ | # Mechanical assembly (Scot) | ||
+ | # Mechanical (Jim) | ||
+ | # Mechanical drawings (Chuck) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Preamp-summing (Chris) | ||
+ | # Light guide gluing setup | ||
+ | #* Wrapping for light guides |
Revision as of 16:06, 24 May 2012
Action Items from previous meetings
-
Determine if swapped bias pins was accidental or in design (Chris) - Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
- Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
-
Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot) - Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
- Review Fcal LED and controller monitoring boards (Fernando)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Beam test experience (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
- Wrapping for light guides
Minutes
Attending:
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Beam test experience (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
- Wrapping for light guides