Difference between revisions of "June 21, 2011 SiPM Electrical and Cooling"
From GlueXWiki
Line 19: | Line 19: | ||
# Preamp-summing (Chris) | # Preamp-summing (Chris) | ||
# Light guide gluing setup | # Light guide gluing setup | ||
− | + | ||
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: | ||
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # Beam test experience (Elton) | ||
+ | # SiPM production testing (everyone) | ||
+ | # Mechanical assembly (Scot) | ||
+ | # Mechanical (Jim) | ||
+ | # Mechanical drawings (Chuck) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Preamp-summing (Chris) | ||
+ | # Light guide gluing setup |
Revision as of 17:17, 21 June 2012
Action Items from previous meetings
- Develop front and back views of jumper sheets.
Also get latest version of drawings(Jack) - Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
-
Design tooling/procedure for making the patterns for wrapping from tedlar (Jim) - Review Fcal LED and controller monitoring boards (Fernando)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Beam test experience (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
Minutes
Attending:
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Beam test experience (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup