Difference between revisions of "June 21, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
 
# Preamp-summing (Chris)
 
# Preamp-summing (Chris)
 
# Light guide gluing setup
 
# Light guide gluing setup
#* Wrapping for light guides
+
 
  
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:
 +
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# Beam test experience (Elton)
 +
# SiPM production testing (everyone)
 +
# Mechanical assembly (Scot)
 +
# Mechanical (Jim)
 +
# Mechanical drawings (Chuck)
 +
# Temperature compensation (Jack)
 +
# Preamp-summing (Chris)
 +
# Light guide gluing setup

Revision as of 17:17, 21 June 2012

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
  2. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  3. Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
  4. Review Fcal LED and controller monitoring boards (Fernando)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup


Minutes

Attending:

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup