#* Ready to ship out 20 strings. | #* Ready to ship out 20 strings. | ||
#* Checking LED output with integrating light meter close to LED. Repeatability of measurements is very good. | #* Checking LED output with integrating light meter close to LED. Repeatability of measurements is very good. | ||
− | # FCAL | + | # FCAL - Construction Status [http://dustbunny.physics.indiana.edu/~mashephe/photos/fcal_photos.pdf Photos] |
− | + | ## Frame almost done and ready to ship | |
+ | ## Question to Tim: Problems with making light tight. Should we keep structure at IU and make reasonable modifications? Yes | ||
+ | ## Tim, John and Matt iterated on the dark room design | ||
+ | ##* Plan to use hard plastic for the front wall. Use hard plastic gluing with large overlaps of material for rigidity and light tightness | ||
+ | ## Fcal power system shown in photos | ||
+ | ##* One of four control chassis to power the bases, each powering 700 bases and using 7 of 8 connectors | ||
+ | ## Bases. | ||
+ | ##* Have tested all the ones that are in house. Fixing the couple of percent failures (mostly HV caps) | ||
+ | ##* Waiting for final shipment of reworked bases from the company | ||
+ | ## Eugene: How much time does it take to assemble one module? Answer: about 5 min/module for the beam test, but budgeted about 45 min /person/module in entire assembly to account for collecting material and placing blocks into array. | ||
+ | ## Platform (Tim) | ||
+ | ##* The downstream platform is ready | ||
+ | ##* | ||
+ | ##* | ||
# BCAL | # BCAL | ||
## Activities at JLab | ## Activities at JLab |
Revision as of 15:37, 11 September 2012
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- TDR:
-
Zisis to check in his working version to allow others to participate. Not checked in yet: Expected Performance and Monitoring. -
Elton will work on the Bcal readout sectionChecked in initial draft - The Fcal section is completely independent and Matt can coordinate this.
-
Tentative Agenda
- Announcements
- Review of Action Items
- Talks at the Collaboration Meeting
- Monitoring
- FCAL
- Construction Status Photos
- BCAL
- Activities at JLab
- SiPM Resolution with Laser (Shaun) Media:SiPM-Laser_20120911.pdf
- SiPM Cosmics on Construction Module (Tegan) Media:CosmicsR.pdf
- USM update
- SiPM Update (Javiera)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- See Feb 14, 2012 Calorimetry Meeting
- Calibration of Calorimeters
- Simulations/Reconstruction
- BCAL Simulation (David L.)
- Any other business
Minutes
Attending: Elton, Dan, David, Yi, Beni, Tim, Eugene (JLab); Javiera, Will, Alam (USM); George, Christina, Stratos (Athens); Matt (IU); Zisis, Shawn, Tegan, Andrei (UofR).
- Announcements
- Review of Action Items
- Talks at the Collaboration Meeting
- Fcal (Matt)
- UofR work (Zisis)
- Monitoring (Christina if available)
- USM one or two talks? -MPPC / light guides- (Hayk?)
- Monitoring
- Media:BCAL results from first 20 strips 11 09 2012.pdf
- Tested 400 LEDs. Selected 200 LEDs for the first 20 strings
- Output of 200 LEDs are within about 25%
- Ready to ship out 20 strings.
- Checking LED output with integrating light meter close to LED. Repeatability of measurements is very good.
- FCAL - Construction Status Photos
- Frame almost done and ready to ship
- Question to Tim: Problems with making light tight. Should we keep structure at IU and make reasonable modifications? Yes
- Tim, John and Matt iterated on the dark room design
- Plan to use hard plastic for the front wall. Use hard plastic gluing with large overlaps of material for rigidity and light tightness
- Fcal power system shown in photos
- One of four control chassis to power the bases, each powering 700 bases and using 7 of 8 connectors
- Bases.
- Have tested all the ones that are in house. Fixing the couple of percent failures (mostly HV caps)
- Waiting for final shipment of reworked bases from the company
- Eugene: How much time does it take to assemble one module? Answer: about 5 min/module for the beam test, but budgeted about 45 min /person/module in entire assembly to account for collecting material and placing blocks into array.
- Platform (Tim)
- The downstream platform is ready
- BCAL
- Activities at JLab
- SiPM Resolution with Laser (Shaun) Media:SiPM-Laser_20120911.pdf
- SiPM Cosmics on Construction Module (Tegan) Media:CosmicsR.pdf
- USM update
- SiPM Update (Javiera)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- See Feb 14, 2012 Calorimetry Meeting
- Calibration of Calorimeters
- Simulations/Reconstruction
- BCAL Simulation (David L.)
- Any other business
Attendees: