Difference between revisions of "Configuration Management"
From GlueXWiki
(→Engineering Documention) |
(→Construction Tracking) |
||
Line 22: | Line 22: | ||
== Construction Tracking == | == Construction Tracking == | ||
− | + | ||
# Forward Drift Chambers [http://pansophy.jlab.org Pansophy Travellers] | # Forward Drift Chambers [http://pansophy.jlab.org Pansophy Travellers] | ||
+ | # [[CDC Construction | Central Drift Chambers]] | ||
+ | # Barrel Calorimeter [http://kronos.phys.uregina.ca/~zisis/travellers/BCALConstruction.htm Module Fabrication], [http://pansophy.jlab.org Pansophy Travellers] | ||
+ | # Forward Calorimeter | ||
+ | # | ||
== Records of Activity in the Hall == | == Records of Activity in the Hall == |
Revision as of 17:05, 9 January 2014
Contents
Detector Specification and Performance
Document Control of Drawings, Specifications and Procedures
We use the JLab Docushare document repository according to the criteria outlined in Design Criteria Document
Engineering Documention
- Engineering design drawings, procedures and specifications are in JLab Document repository
- Additional Mechanical Engineering documentation
- On Windows machines M:\halld_engineering\
- On Unix machines: /group/halld_engineering/
- Electrical Engineering procedures and specifications
- Electrical Engineering documentation (access controlled by Fernando Barbosa)
- On Windows machines M:\halld-electronics\
- On Unix machines: /group/halld-electronics/
Construction Tracking
- Forward Drift Chambers Pansophy Travellers
- Central Drift Chambers
- Barrel Calorimeter Module Fabrication, Pansophy Travellers
- Forward Calorimeter