Difference between revisions of "2007-11-28"
(more formatting) |
|||
Line 66: | Line 66: | ||
==Report from Calorimetry Technical Group== | ==Report from Calorimetry Technical Group== | ||
− | + | Zisis reported on items from the last meeting of the group. See his [[November 23, 2007 Calorimetry|minutes]] for details. | |
− | + | ||
− | == | + | Tim will send something[???} to the machine shop today. |
+ | |||
+ | ==Detector Updates== | ||
===beamline and tagger=== | ===beamline and tagger=== | ||
− | design contract for tagger to procurement soon | + | * Elke: design contract for tagger to go to procurement soon |
− | will be reviewed by | + | ** will be reviewed by accelerator division |
− | documents on the wiki are near up-to-date | + | * Elke: documents on the wiki are near up-to-date |
− | + | * Tim: sample for tagger interface drawing will be sent this week | |
===solenoid=== | ===solenoid=== | ||
− | coil 3 looks worse that we thought | + | Elke reported items from George: |
− | started testing coils at | + | |
+ | * coil 3 looks worse that we thought | ||
+ | ** will completely open and replace some tubing | ||
+ | ** there are some contract issues with IUCF to be sorted out (see above) | ||
+ | * we have started testing coils at JLab | ||
===target=== | ===target=== | ||
− | + | Tim reported on yesterday's meeting. | |
− | specification | + | |
− | racks for gas system, system itself | + | * reviewed tracking list |
− | alignment accuracies | + | * temporary solid target discussed (for sue during startup) |
− | thermometry | + | * specification to-do list reviewed |
− | cryogenics: independent system or use magnet system | + | * discussion of racks for the gas system, gas system itself, were discussed |
+ | * discussion of alignment accuracies | ||
+ | * discussion of thermometry | ||
+ | * discussion cryogenics: independent system or use magnet system | ||
===start counter=== | ===start counter=== | ||
− | + | Werner reported on discussions of geometry. Some items: | |
− | + | ||
− | overall dimensions, stay-in zone | + | * overall dimensions, stay-in zone |
− | target independent of start counter desired | + | * target independent of start counter desired |
− | 2004 geometry for counters | + | * 2004 geometry for counters themselves still looks good with current rate estimates |
===CDC=== | ===CDC=== | ||
− | Yves | + | Yves gave a detailed report on recent progress at CMU. See his status reports ([[CDC_21_11_2007|1]], [[CDC_28_11_2007|2]]) on the web for details. |
− | + | ||
− | Gerard had some concerns about cabling and grounding. will talk with Yves | + | Gerard had some concerns about cabling and grounding based on the photograph of the prototype. He will talk with Yves offline. |
− | Gerard's trip to CMU has yet to be scheduled. He wants to look at some of the CMU | + | |
+ | Gerard's trip to CMU has yet to be scheduled. He wants to look at some of the CMU electronics in advance of the trip. | ||
===FDC=== | ===FDC=== | ||
− | Dan | + | Dan gave the report: |
− | + | ||
− | + | * Procurement of the wire winding contract is waiting on final budget from IUCF | |
− | construction more accurate with new jig | + | * Composite wire frames are being produced. Brian will have five by next week. |
− | + | ** construction is more accurate with new jig | |
− | another offer of new space for | + | * Test Lab set-up being put back together. Denny Insley is helping. |
− | + | * another offer of new space for FDC's downstairs in CEBAF Center has materialized | |
− | + | ** Brian also has space in the EEL. | |
− | + | ** Space in the clean room being discussed with Jack Segal | |
− | FDC meeting tomorrow | + | * Interposer/daughter boards have not yet been transferred from Fernando. FDC group not quite ready to test them yet. |
− | combined FDC/CDC tracking meeting TBA | + | * There will be an FDC meeting tomorrow; agenda has been circulated |
+ | * The combined FDC/CDC/tracking meeting TBA | ||
===bcal=== | ===bcal=== |
Revision as of 18:16, 28 November 2007
Contents
Meeting Time and Place
- Location:
- ESNET: 8242553
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- Enter Code: 39527048#
- Time: 10:00am EST
Agenda
- Announcements
- Reports from Technical Groups
- Calorimetry: November 23, 2007 Calorimetry
- Overview of on-going R&D contracts.
- Detector Updates
- Beamline & Tagger
- Solenoid
- Target
- Start Counter
- UPV
- CDC (Status Report on the CDC_21_11_2007 CDC_28_11_2007 )
- FDC
- BCAL
- TOF
- FCAL
- Electronics
- Online
- Offline
- Monte Carlo: Status Report on CD3 simulation geometry
- AOT
Minutes
Present:
- JLab: Tim, Simon, Dave L., Carl, Eugene, Mark, John D., Dan, Elke, Claus, Dave D., Fernando
- UConn: Richard
- IUCF: Gerard
- CMU: Curtis, Yves
- Athens: Christine
Announcements
Elke had a few:
- JLab in a hiring freeze at present
- Next week, Monday trought Friday, is the EVMS review
- cost account managers will make presentations
- physics is scheduled for Wednesday morning
Elke proposed that we drop our meeting for next week. All agreed.
R&D Contracts
Elke reported on this item.
- Work proceeds in conjuction with JLab Procurement
- Several contracts that ran from 2002 to 2007 have to be re-visited
- These include IUCF and Regina - The Regina one has been dealt with: second last invoice has been sent, last one will be after Phase-1 close out before the end of the year
- Most likely these contracts will be closed and re-open with new ones.
- Elke has list of all known contracts
- It is an Excel spreadsheet
- She will send it around soon.
Report from Calorimetry Technical Group
Zisis reported on items from the last meeting of the group. See his minutes for details.
Tim will send something[???} to the machine shop today.
Detector Updates
beamline and tagger
- Elke: design contract for tagger to go to procurement soon
- will be reviewed by accelerator division
- Elke: documents on the wiki are near up-to-date
- Tim: sample for tagger interface drawing will be sent this week
solenoid
Elke reported items from George:
- coil 3 looks worse that we thought
- will completely open and replace some tubing
- there are some contract issues with IUCF to be sorted out (see above)
- we have started testing coils at JLab
target
Tim reported on yesterday's meeting.
- reviewed tracking list
- temporary solid target discussed (for sue during startup)
- specification to-do list reviewed
- discussion of racks for the gas system, gas system itself, were discussed
- discussion of alignment accuracies
- discussion of thermometry
- discussion cryogenics: independent system or use magnet system
start counter
Werner reported on discussions of geometry. Some items:
- overall dimensions, stay-in zone
- target independent of start counter desired
- 2004 geometry for counters themselves still looks good with current rate estimates
CDC
Yves gave a detailed report on recent progress at CMU. See his status reports (1, 2) on the web for details.
Gerard had some concerns about cabling and grounding based on the photograph of the prototype. He will talk with Yves offline.
Gerard's trip to CMU has yet to be scheduled. He wants to look at some of the CMU electronics in advance of the trip.
FDC
Dan gave the report:
- Procurement of the wire winding contract is waiting on final budget from IUCF
- Composite wire frames are being produced. Brian will have five by next week.
- construction is more accurate with new jig
- Test Lab set-up being put back together. Denny Insley is helping.
- another offer of new space for FDC's downstairs in CEBAF Center has materialized
- Brian also has space in the EEL.
- Space in the clean room being discussed with Jack Segal
- Interposer/daughter boards have not yet been transferred from Fernando. FDC group not quite ready to test them yet.
- There will be an FDC meeting tomorrow; agenda has been circulated
- The combined FDC/CDC/tracking meeting TBA
bcal
zisis cosmics with sipm on bcal monte carlo work continuing george working on statement of work for sipm's question for elke, test fibers have been ordered for S, kurai this week might be two months to get them without some special effort or arrangement
tof
beni nothing to report
fcal
beni test stand set-up for plastic wall for holding pmt's, test heat tolerance 8:30 fri. cd3 preparation meeting will get nim electronics from IUCF transportainer george asked about beamlines at triumf for testing
beamline available need two month notice 8x8 block fcal test electronics must come with experimenters
russion radhard lead glass blocks
1 block for 260$ limited accuracy in dimensions 2mm tolerance
calibration
christina collecting components for a prototype system discussion with company for purchasing LED drivers have some tiny LED's to start with
electronics
pre-amp cards, cables connectectors done this week, for FDC and CDC assembled and remain to be tested FADC 250 MHz is in good shape, FCAL and BCAL to provide trigger
online
Elliott not here
offline
DAvid l nothgint to report
Monte Carlo
Richard new geometry space between stereo and axial apckages endplate material dominiated by endplug, needs to be modeled propersly questions about bcal details