Difference between revisions of "Photon Beam Commissioning Discussion Aug 20, 2014"
From GlueXWiki
(→Action Items) |
|||
Line 12: | Line 12: | ||
== Action Items == | == Action Items == | ||
− | * Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Richard is working to update the defined geometry based on [http://zeus.phys.uconn.edu/halld/tagger/tagger_vault.pdf a drawing received from Tim], Richard will add field map from Dan Sober | + | * <strike> Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Richard is working to update the defined geometry based on [http://zeus.phys.uconn.edu/halld/tagger/tagger_vault.pdf a drawing received from Tim], Richard will add field map from Dan Sober </strike> |
* Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) | * Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) | ||
** Need rates for profiler, start counter, ps | ** Need rates for profiler, start counter, ps | ||
* Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune. | * Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune. | ||
* Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline. | * Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline. | ||
− | * Alexandre will meet with RadCon next week to coordinate details of accessing monitor information | + | * <strike> Alexandre will meet with RadCon next week to coordinate details of accessing monitor information </strike> |
== Agenda == | == Agenda == |
Revision as of 08:44, 21 August 2014
Organization
- Time: 4 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
-
Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Richard is working to update the defined geometry based on a drawing received from Tim, Richard will add field map from Dan Sober - Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
- Need rates for profiler, start counter, ps
- Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune.
- Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline.
-
Alexandre will meet with RadCon next week to coordinate details of accessing monitor information
Agenda
- Announcements
- Recommendations from ERR Report
- Aug 8 Photon Beam Commissioning Review Final Report
- ARR presentations
- Accelerator and Hall D Interface Document - needs to be finalized.
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business
Minutes
Attending:
- Announcements
- Recommendations from ERR Report
- Aug 8 Photon Beam Commissioning Review Final Report
- ARR presentations
- Accelerator and Hall D Interface Document - needs to be finalized.
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business