Difference between revisions of "Photon Beam Commissioning Discussion Oct 8, 2014"
From GlueXWiki
Line 30: | Line 30: | ||
== Minutes == | == Minutes == | ||
− | Attending: Elton, Hovanes, Eugene, Tim, Alexandre (JLab); Pavel, George (RadCon); Michael (Ops); Alex Barnes (UConn); Curtis (CMU); | + | "Attending: Elton, Hovanes, Eugene, Tim, Alexandre (JLab); Pavel, George (RadCon); Michael (Ops); Alex Barnes (UConn); Curtis (CMU); |
− | |||
# Announcements | # Announcements | ||
# ARR3 Recommendations | # ARR3 Recommendations | ||
Line 41: | Line 40: | ||
# RadCon update | # RadCon update | ||
# Other business | # Other business | ||
− | |||
− | |||
− |
Revision as of 17:12, 8 October 2014
Organization
- Time: 4:00 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
- Need rates for profiler, start counter, ps
- Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)
-
Screen of beam parameters for Hall D (Hovanes) -
Feedback on accelerator on latest ICD draft (Michael, Todd) -
List of variables from radiation monitors to Pavel (Hovanes and Alexandre)
Agenda
- Announcements
- ARR3 Recommendations
- Accelerator and Hall D Interface Document - update
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business
Minutes
"Attending: Elton, Hovanes, Eugene, Tim, Alexandre (JLab); Pavel, George (RadCon); Michael (Ops); Alex Barnes (UConn); Curtis (CMU);
- Announcements
- ARR3 Recommendations
- Accelerator and Hall D Interface Document - update
- Update on Photon Commissioning (Alexandre)
- Beam Simulations
- RadCon update
- Other business