Difference between revisions of "January 26, 2015"

From GlueXWiki
Jump to: navigation, search
Line 16: Line 16:
 
::: - check with acquired data
 
::: - check with acquired data
 
: FCAL thresholds tuning
 
: FCAL thresholds tuning
::: - rate study (MC)
+
::: - check rates with MC simulation (MC)
 
::: - MIP response
 
::: - MIP response
 +
: Coincidence of FCAL with other sub-detectors
  
: - check rates with the simulation (in progress)
 
  
 
* Level-1 Monitor
 
* Level-1 Monitor

Revision as of 10:54, 26 January 2015

  • Trigger setup in the counting house (Sergei)
- two crates have been moved from F117. Take one crate from the trigger rack in the hall.
- find replacement for the crate in the hall (realocate DSC to another crate)
  • Firmware update
- TI, FADC250 (BCAL, PS/PSC, ST, TAGM/TAGH)
- Change jumpers/switches on SD boards for bcal crates (Sergei P.)
- connect TI trigger front panel output to F1 TDCs
- Check trigger performance with play back - in progress
  • Trigger algorithm study for the spring run
FCAL trigger tuning
decreasing integration window size (time).
- propagation time for MIPs (MC simulation)
- cable length, PMT transit time spread
- check with acquired data
FCAL thresholds tuning
- check rates with MC simulation (MC)
- MIP response
Coincidence of FCAL with other sub-detectors


  • Level-1 Monitor