Difference between revisions of "Offline Monitoring Data Validation"

From GlueXWiki
Jump to: navigation, search
(Procedure)
Line 1: Line 1:
 
This page contains the procedure for checking if production runs are of good quality and can be used for physics analysis.
 
This page contains the procedure for checking if production runs are of good quality and can be used for physics analysis.
 +
 +
= Run Periods =
 +
 +
[[RunPeriod-2016-02 Validation]]
  
 
= Procedure =
 
= Procedure =

Revision as of 16:58, 11 March 2016

This page contains the procedure for checking if production runs are of good quality and can be used for physics analysis.

Run Periods

RunPeriod-2016-02 Validation

Procedure

For each production run, do the following:

  • Go to the | Offline Run Browser page.
  • Follow the steps outlined in the checklist below.
  • Certify that each section is okay
    • (DB + script to be developed)
  • Set run status = 1 in RCDB
    • (script provided)

Checklist

  • BCAL
    • Check ...
  • CDC
    • Check ...
  • FCAL
    • Check ...
  • FDC
    • Check ...
  • PS
    • Check ...
  • SC
    • Check ...
  • TAGH
    • Check ...
  • TAGM
    • Check ...
  • TOF
    • Check ...
  • RF
    • Check timing offsets - Reference: [link]
      • Should be centered around zero
  • Timing
    • Check Track Matched Timing - Reference: [link]
    • Check Tagger/RF Timing - Reference: [link]
    • Check Tagger/SC Timing - Reference: [link]
  • Analysis
    • Check ...