Difference between revisions of "Run Planning Meeting Notes, Dec 5-Dec 11, 2019"
From GlueXWiki
(→next meeting (hopefully Monday, Dec 9 at 08:45)) |
(→next meeting (hopefully Monday, Dec 9 at 08:45)) |
||
Line 27: | Line 27: | ||
#* Diamond alignment whenever Hovanes is ready (daytime) | #* Diamond alignment whenever Hovanes is ready (daytime) | ||
#* Sunday, if the diamond has been aligned, David CPP test for 1h | #* Sunday, if the diamond has been aligned, David CPP test for 1h | ||
+ | # Issues | ||
+ | #* Gluon 4 froze again | ||
+ | #* Several DAQ crashes | ||
== Friday, Dec 6 at 08:45 == | == Friday, Dec 6 at 08:45 == |
Revision as of 12:18, 7 December 2019
<- Back to Run Coordination Meetings:Fall2019 Run
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 1
- Hall D schedule for week 2
- BTA guidelines
next meeting (hopefully Monday, Dec 9 at 08:45)
- Since Friday morning:
- Morning data-taking was curtailed by a radiation level problem which prevented MCC from delivering beam to any of the halls. We used this time for the many requested opportunistic access requests - Colin (rebooting FCAL's PDU), Hovanes (ComCAL), Scot (PS magnet), Beni (TOF), Nick(?).
- Solenoid started ramping at 7am, finished around 5pm
- Richard resumed PS uscope threshold scan piecemeal whenever he could, running independently
- Bill took some DIRC LED trigger data, also running independently
- CDC and TOF HV scans completed.
- Tagger microscope HV scan data collection completed
- DIRC commissioning runs continued overnight
- Data from run 70835 on (Saturday morning) includes the TagM in the readout
- Hovanes found that he needs to update the diamond alignment software, so we continue taking DIRC data until he is ready to start the alignment, probably not today.
- Plan for the weekend
- Continue DIRC commissioning
- Diamond alignment whenever Hovanes is ready (daytime)
- Sunday, if the diamond has been aligned, David CPP test for 1h
- Issues
- Gluon 4 froze again
- Several DAQ crashes
Friday, Dec 6 at 08:45
- Last 24h:
- Now have enough straight track data for GEM at all 3 positions
- GEM_TRD firmware updated between beam left and beam right running
- FADC replaced on GEM_TRD. Readout issues with GEM_TRD (see Lubomir's logentry).
- Richard started completing the uscope threshold scan ~6am ish - working on this until 11am. Busy (UConn) until 5pm.
- Solenoid is ramping (Tim/Beni)
- Hovanes disabled the alarms on two TAGH channels which have faulty HV boards
- Issues
- Lubomir's logentry, GEM_TRD
- Beni, TOF
- Rootspy (errors, preferred gluon, run #, plots)
- BTA - cannot edit old timesheets
- Reports
- Plan for today
- Start solenoid ramping
- Access at ~11 or when Richard finishes uscope scan
- (Empty target before Richard does tagger accidentals measurement) (postpone these)
- Fill target.
- CDC & TOF scans
- TOF HV SCAN FALL 2019
- CDC scan return to 2125V afterwards
- DIRC commissioning field-on
- Opp access request from Sasha 30 mins to replace fcal fadcs, Nick, Colin, Beni...
- Plan for later
- Reschedule tagger accidentals
- Alexandre's comprehensive runplan now at #5
- Spin dance likely Monday or Tuesday. We can have beam for some/most of this time.
- Diamond alignment likely on Wednesday?
- Notes from this meeting.
- Access at 11 for work as above
- Alignment on Saturday as stable beam most likely
- uscope threshold scan top priority
- DIRC commissioning can use amo if necessary
- try to reschedule tagger accidentals
- No weekend meetings planned at present
Thursday, Dec 5 at 08:45
- Last 24h:
- Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
- Sean got the general detector checkout done.
- Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
- Sasha set up trigger config for straight tracks excluding uscope so Richard can work independently
- Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
- Lubomir's logentry
- Issues
- Solenoid alarm
- PSS fault
- GEM cable or module swap
- Plan for today
- After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
- Move GEM to position 3, then take more data until ~6am Friday?
- Plan for later
- Alexandre's comprehensive runplan now at 3-4
- Notes from this meeting.
- Also need to check the GEM readout config
- Beam time request from David for CPP
- Radiation levels report from Alexandre
- Repeated alarms for TAGH 151