Difference between revisions of "Bill's to do list"
From GlueXWiki
(→2019) |
(→2019) |
||
Line 20: | Line 20: | ||
* Temperature reduction for the DIRC FPGAs. | * Temperature reduction for the DIRC FPGAs. | ||
* Water quality setup, 3D printing the box. | * Water quality setup, 3D printing the box. | ||
− | * Darkening. &# | + | * Darkening. <span>✓</span> |
− | * Uni-strut reinforcement for the distribution boxes.&# | + | * Uni-strut reinforcement for the distribution boxes. <span>✓</span> |
− | * Airflow sensor &# | + | * Airflow sensor <span>✓</span> |
*Opening both DIRC boxes in January: | *Opening both DIRC boxes in January: | ||
− | ** Check mirror quality &# | + | ** Check mirror quality <span>✓</span> |
− | ** Check anodize quality &# | + | ** Check anodize quality <span>✓</span> |
− | ** Check water tightness of the diffuser assembly. &# | + | ** Check water tightness of the diffuser assembly. <span>✓</span> |
*North Box: | *North Box: | ||
− | **Check corner interference. &# | + | **Check corner interference. <span>✓</span> |
− | **Silicone around the wielding spot. | + | **Silicone around the wielding spot. <span>✓</span> |
*South Box: | *South Box: | ||
**Check the chipped corner water seal for both spots | **Check the chipped corner water seal for both spots | ||
==2020== | ==2020== |
Revision as of 13:02, 31 January 2020
2018
- Priority list:
- Laser alignment and generating mis-alignment table (Bill, Andrew).
- Feedthrough opening angle measurement and fish tank (Bill, Fernando).
- Light monitors testing and mounting (Bill, Keith).
- DIRC module cabling strategy (Bill/Andrew).
- Hole opening on the backplate (Keith).
- Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby).
- Plastic bolts and screws for the FPGA board. (Chris)
- Recover PMT #9 and 10 and perform test
- Spare micro-BNC cable for the big box. (Omen)
- Cleaning of the mirrors. (Greg, Keith)
- Remarking and repositioning the Fiber cable label. (Fernando/Chris)
- PMT mounting plate spacer (Bobby)
- Installation tray. (Mark/Keith)
- Installation spacer. (Bobby)
2019
- Temperature reduction for the DIRC FPGAs.
- Water quality setup, 3D printing the box.
- Darkening. ✓
- Uni-strut reinforcement for the distribution boxes. ✓
- Airflow sensor ✓
- Opening both DIRC boxes in January:
- Check mirror quality ✓
- Check anodize quality ✓
- Check water tightness of the diffuser assembly. ✓
- North Box:
- Check corner interference. ✓
- Silicone around the wielding spot. ✓
- South Box:
- Check the chipped corner water seal for both spots