Difference between revisions of "Bill's to do list"
From GlueXWiki
(→2020 Summer DIRC list) |
(→2018) |
||
Line 2: | Line 2: | ||
==2018== | ==2018== | ||
# Priority list: | # Priority list: | ||
− | #* Laser alignment and generating mis-alignment table (Bill, Andrew). | + | #* Laser alignment and generating mis-alignment table (Bill, Andrew). <span>✓</span> |
− | #* Feedthrough opening angle measurement and fish tank (Bill, Fernando). | + | #* Feedthrough opening angle measurement and fish tank (Bill, Fernando). <span>✓</span> |
− | #* Light monitors testing and mounting (Bill, Keith). | + | #* Light monitors testing and mounting (Bill, Keith). <span>✓</span> |
− | #* DIRC module cabling strategy (Bill/Andrew). | + | #* DIRC module cabling strategy (Bill/Andrew). <span>✓</span> |
− | #* Hole opening on the backplate (Keith). | + | #* Hole opening on the backplate (Keith). <span>✓</span> |
− | #* Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby). | + | #* Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby). <span>✓</span> |
− | #* Plastic bolts and screws for the FPGA board. (Chris) | + | #* Plastic bolts and screws for the FPGA board. (Chris) <span>✓</span> |
− | #* Recover PMT #9 and 10 and perform test | + | #* Recover PMT #9 and 10 and perform test <span>✓</span> |
− | #* Spare micro-BNC cable for the big box. (Omen) | + | #* Spare micro-BNC cable for the big box. (Omen) <span>✓</span> |
− | #* Cleaning of the mirrors. (Greg, Keith) | + | #* Cleaning of the mirrors. (Greg, Keith) <span>✓</span> |
− | #* Remarking and repositioning the Fiber cable label. (Fernando/Chris) | + | #* Remarking and repositioning the Fiber cable label. (Fernando/Chris) <span>✓</span> |
− | #* PMT mounting plate spacer (Bobby) | + | #* PMT mounting plate spacer (Bobby) <span>✓</span> |
− | #* Installation tray. (Mark/Keith) | + | #* Installation tray. (Mark/Keith) <span>✓</span> |
− | #* Installation spacer. (Bobby) | + | #* Installation spacer. (Bobby) <span>✓</span> |
==2019== | ==2019== |
Revision as of 13:33, 31 January 2020
2018
- Priority list:
- Laser alignment and generating mis-alignment table (Bill, Andrew). ✓
- Feedthrough opening angle measurement and fish tank (Bill, Fernando). ✓
- Light monitors testing and mounting (Bill, Keith). ✓
- DIRC module cabling strategy (Bill/Andrew). ✓
- Hole opening on the backplate (Keith). ✓
- Hole opening on the of the PMT mounting plate (Tim, Keith, Bobby). ✓
- Plastic bolts and screws for the FPGA board. (Chris) ✓
- Recover PMT #9 and 10 and perform test ✓
- Spare micro-BNC cable for the big box. (Omen) ✓
- Cleaning of the mirrors. (Greg, Keith) ✓
- Remarking and repositioning the Fiber cable label. (Fernando/Chris) ✓
- PMT mounting plate spacer (Bobby) ✓
- Installation tray. (Mark/Keith) ✓
- Installation spacer. (Bobby) ✓
2019
- Temperature reduction for the DIRC FPGAs.
- Water quality setup, 3D printing the box.
- Darkening. ✓
- Uni-strut reinforcement for the distribution boxes. ✓
- Airflow sensor ✓
- Opening both DIRC boxes in January:
- Check mirror quality ✓
- Check anodize quality ✓
- Check water tightness of the diffuser assembly. ✓
- North Box:
- Check corner interference. ✓
- Silicone around the wielding spot. ✓
- South Box:
- Check the chipped corner water seal for both spots
2020 Summer DIRC list
- Water level sensor installation
- Darkening leak check
- Modification on vent exit to reduce FPGA temperature
- Testing spare DIRC modules
- DIRC Diffuser seal issue
- North LED 2 replacement
- Water test fixture
- Control and operation
- Alarm modification strategy
- Resolving (double checking) DIRC hole in occupancy before run starts
- Dis-entangle DIRC interlock and interlock reset from FCAL and CCOM
- Individual (stand alone) SiPM TDA offset
- contaminated mirror replacement