Difference between revisions of "Analysis shift"
From GlueXWiki
Line 16: | Line 16: | ||
<br>CC Room 306 is ours to use throughout the experiment for collaboration and work. | <br>CC Room 306 is ours to use throughout the experiment for collaboration and work. | ||
− | |||
<br>Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171 | <br>Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171 | ||
+ | |||
=== Summary Physics Shift Analysis === | === Summary Physics Shift Analysis === |
Revision as of 14:53, 10 November 2021
Contents
Analysis Shift
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
- Responsible for:
- Checking data coming in from monitoring (plot browser),
- Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
- Where to find information to fill the spreadsheet
- Completing data quality run-by-run,
- Contacting the appropriate team member if there is a concern with a specific monitoring plot,
- Contact the counting house ( (757)269-5504) )
- Update daily analysis meeting with production runs.
CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
Summary Physics Shift Analysis
List of good production runs
- updated until: 90064
- By radiator:
- amorphous radiator: 90034-90039, 90045, 90062
- diamond radiator: 90051, 90059, 90061, 90063-90064
List of trigger configurations
- FCAL_BCAL_PS_SRC_m9.conf
- Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
- Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
- Bit 3: PS