Difference between revisions of "JEF meeting, February 18, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 11: | Line 11: | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_17_22/silicon_cookies.jpg Silicon cookies] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_17_22/silicon_cookies.jpg Silicon cookies] | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_17_22/pmt_light_guide.jpg Light guides] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_17_22/pmt_light_guide.jpg Light guides] | ||
+ | ** Igal is cutting Kapton, ESR (for LG), and mu-metal | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha ] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_17_22/fab_mod_2_17_22.jpg Fabricated modules in TEDF ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha ] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_17_22/fab_mod_2_17_22.jpg Fabricated modules in TEDF ] |
Revision as of 22:09, 17 February 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- got 6 more fixtures to preshape ESR. 16 fixtures can be loaded to the oven now. Expected DSG production rate: up to 72 foils per week
- Regular meeting with the DSG group during next week. Try to coordinate crystal wrapping.
- Arshak and Sasha are working on preparing supplies.
- Igal is cutting Kapton, ESR (for LG), and mu-metal
- got 6 more fixtures to preshape ESR. 16 fixtures can be loaded to the oven now. Expected DSG production rate: up to 72 foils per week
- Module fabrication -- Sasha
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations