Difference between revisions of "JEF meeting, April 8, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 6: | Line 6: | ||
* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
− | ** Getting summer students involved in the project. Vaccinated students will be permitted to the lab according to the communication with Brian Hanlon (still to be checked). [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/task_list/task_list_fcal2_fabrication_v2.pdf List of possible tasks] | + | ** Getting summer students involved in the project. Vaccinated students will be permitted to the lab according to the communication with Brian Hanlon (still to be checked). [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/task_list/task_list_fcal2_fabrication_v2.pdf List of possible tasks], expect 5 - 6 students. |
** [https://halldweb.jlab.org/wiki/index.php/CRYTUR 60 CRYTUR crystals have been received (and accepted)] | ** [https://halldweb.jlab.org/wiki/index.php/CRYTUR 60 CRYTUR crystals have been received (and accepted)] | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/nps_siccas1.jpg 91 + 40 = 131 SICCAS crystals were moved from the NPS lab][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/nps_siccas.jpg]. 40 of them have been checked/tested before. Crystals have to be inventorized. | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/nps_siccas1.jpg 91 + 40 = 131 SICCAS crystals were moved from the NPS lab][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_8_22/nps_siccas.jpg]. 40 of them have been checked/tested before. Crystals have to be inventorized. |
Revision as of 23:16, 7 April 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- Getting summer students involved in the project. Vaccinated students will be permitted to the lab according to the communication with Brian Hanlon (still to be checked). List of possible tasks, expect 5 - 6 students.
- 60 CRYTUR crystals have been received (and accepted)
- 91 + 40 = 131 SICCAS crystals were moved from the NPS lab[1]. 40 of them have been checked/tested before. Crystals have to be inventorized.
- Chris continues brazing brass straps. Some minor issues with brazing the front flange [2]. Selected bad more than 20 assemblies [3] (can be fixed). Revisited the brazing procedure with Tim and Chris. Chris was sick for a couple of days, some backlog in module fabrication.
- DSG: more than 600 ESR foils have been preshaped, more than 150 crystals have been wrapped.
- Production of Silicon cookies at the GWU [4]. See Olga's report. Contract with the GWU is under preparation.
- Igal: continues wrapping mu-metal foils and ESR
- Procurement of spare PMTs: no price increase [5] (hopefully can order 100 tubes).
- Module fabrication -- Sasha
- Meeting with Tim's group and Fernando regarding FCAL2 insert cables -- Sasha
- Light Monitoring System -- Arshak
- COMCAL tests, TAC running, etc. -- Sasha
- Data analysis
- Simulations