Difference between revisions of "May 12, 2022 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 47: | Line 47: | ||
# Announcements | # Announcements | ||
#* PrimEx run extended to 11/6/22, so next GlueX-II run with DIRC will be 11/11/22-3/19/23 (followed by long downtime for FCAL-II upgrade) | #* PrimEx run extended to 11/6/22, so next GlueX-II run with DIRC will be 11/11/22-3/19/23 (followed by long downtime for FCAL-II upgrade) | ||
+ | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5580 RICH2022 abstract] | ||
#* Summer 2022 meeting strategy | #* Summer 2022 meeting strategy | ||
# [https://logbooks.jlab.org/entry/3994020 Mirror prototype status] (Justin) | # [https://logbooks.jlab.org/entry/3994020 Mirror prototype status] (Justin) | ||
Line 67: | Line 68: | ||
#** Reducing background contamination in pi/K samples: KinFit Δχ<sup>2</sup> between 2pi and 2k reactions, robust sideband subtraction | #** Reducing background contamination in pi/K samples: KinFit Δχ<sup>2</sup> between 2pi and 2k reactions, robust sideband subtraction | ||
#** [https://github.com/yunjie-yang/FastDIRC4GlueX FastDIRC documentation] (Yunjie) | #** [https://github.com/yunjie-yang/FastDIRC4GlueX FastDIRC documentation] (Yunjie) | ||
− | |||
# AOB | # AOB |
Revision as of 11:55, 12 May 2022
Meeting Information
GlueX DIRC Meeting
Thursday, May 12, 2022
12:00 pm, ET
Meeting Connections
Remote Connection
[Expand]
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607894234 (Click "Expand" to the right for more details -->):
More zoom information on the wiki
Agenda
- Announcements
- PrimEx run extended to 11/6/22, so next GlueX-II run with DIRC will be 11/11/22-3/19/23 (followed by long downtime for FCAL-II upgrade)
- RICH2022 abstract
- Summer 2022 meeting strategy
- Mirror prototype status (Justin)
- FPGA status (Bill)
- Preparation for upcoming run:
- Installation of LED fibers and diffusers (next week)
- Final checkout requires disconnecting CPP electronics (end of July during transition to PrimEx)
- Review of 2020 studies (All)
- Analysis Launch ver04 with corrected software for TOF timing and current DIRC corrections.
- Analytic PDF studies
- Geometric reconstruction studies
- Simulation needs:
- Ad-hoc reduction in photon yields (in mcsmear) to match data: until mirror reflectivity dependence on incident angle is implemented
- Action items (from previous meetings)
- Add incident angle dependence to mirror reflectivity
- Global alignment issues see slide 15-18 of CM talk (All)
- Early studies of FDC tilt
- Possible rotation of magnetic field: impact on extrapolations to DIRC?
- Generate MC with rotated field and reconstruct with nominal?
- Reducing background contamination in pi/K samples: KinFit Δχ2 between 2pi and 2k reactions, robust sideband subtraction
- FastDIRC documentation (Yunjie)
- AOB