Difference between revisions of "JEF meeting, July 1, 2022"
From GlueXWiki
(Created page with "=meeting time and location= *9:30 am EST (JLab time) remote only *Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142...") |
(→Agenda) |
||
Line 5: | Line 5: | ||
=Agenda= | =Agenda= | ||
* Simulations/Analysis | * Simulations/Analysis | ||
+ | |||
* Preparation of parts for FCAL2 modules -- Sasha | * Preparation of parts for FCAL2 modules -- Sasha | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | ||
+ | *** Preshaping ESR foils (with the DSG) | ||
+ | *** Wrapping crystals (with the DSG) | ||
+ | *** Module fabrication | ||
+ | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 491 (60 + 185 + 166 + 80) | ||
+ | *** Remaining 126, 1.5 weeks of work | ||
+ | **Students reports | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
+ | ** Fabricated modules: <span style="color:#FF0000"> Total 598 </span> | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All 561 SICCAS] | ||
+ | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 37 CRYTUR], Remaining: 590 | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126] | ||
+ | |||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 08:42, 1 July 2022
meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Preparation of parts[1][2][3]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Module fabrication
- Wrapped CRYTUR crystals: 491 (60 + 185 + 166 + 80)
- Remaining 126, 1.5 weeks of work
- Students reports
- Preparation of parts[1][2][3]
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 598
- All 561 SICCAS
- 37 CRYTUR, Remaining: 590
- Clean room EEL126
- Light Monitoring System -- Arshak