Difference between revisions of "JEF meeting, July 15, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 9: | Line 9: | ||
*** Preshaping ESR foils (with the DSG) | *** Preshaping ESR foils (with the DSG) | ||
*** Wrapping crystals (with the DSG) | *** Wrapping crystals (with the DSG) | ||
+ | *** Preparing Silicon cookies | ||
*** Module fabrication | *** Module fabrication | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 600 (60 + 185 + 166 + 80 + 68) | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 600 (60 + 185 + 166 + 80 + 68) |
Revision as of 08:50, 15 July 2022
Meeting time and location=
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Preparation of parts[1][2][3]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Preparing Silicon cookies
- Module fabrication
- Wrapped CRYTUR crystals: 600 (60 + 185 + 166 + 80 + 68)
- All currently available (consider to borrow some spares from NPS)
- Preparation of parts[1][2][3]
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 746
- All 853 SICCAS
- 292 CRYTUR, Remaining: 442
- Clean room EEL126
- Light Monitoring System -- Arshak