Difference between revisions of "JEF meeting, March 24, 2023"
From GlueXWiki
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only *Zoom meeting ID: [https://jlab-org.zoomgov.com/j/1610509142?pwd=STNZUmNoMElqbHRVdjlVb0ZzR1piZz09 161 050 9142]...") |
|||
Line 6: | Line 6: | ||
*'''Preparation of parts for FCAL2 modules''' -- Sasha | *'''Preparation of parts for FCAL2 modules''' -- Sasha | ||
+ | ** Available crystals: | ||
+ | **: 1450 (modules) | ||
+ | **: 32 (ready for fabrication) | ||
+ | **: 40 (installed on CCAL) available on March 20 | ||
+ | **: (some CCAL crystals from the inner part will not be used for the FCAL2) | ||
+ | **: 95 expect to receive from CRYTUR in May [https://halldweb.jlab.org/wiki/index.php/CRYTUR ] | ||
+ | **: Total 1617 | ||
+ | ** George (DSG group) finished with disassembling CCAL modules and removing LMS caps. Will work on preshaping ESR reflectors for CRYTUR. The oven will be ready in a week. | ||
+ | ** Mindy (DSG group) solder wires to sockets (while waiting for crystals). More crystals will come from the CCAL during next week. | ||
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
− | * '''Testing of PMT dividers''' -- Sasha / Arshak | + | <!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] --> |
+ | ** Fabricated modules: <span style="color:#FF0000"> Total 1470 </span> (15 modules fabricated since last week) | ||
+ | **: Currently available for fabrication: 12 | ||
+ | <!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 + 3 SICCAS] --> | ||
+ | <!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 834 CRYTUR], available: 1 --> | ||
+ | <!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] --> | ||
+ | * '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | ||
+ | ** FCAL2 modules with dividers installed on the CCAL [https://logbooks.jlab.org/entry/4140983] | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
+ | ** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Installation_Meetings] | ||
+ | ** Manpower and division of tasks | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ] | ||
+ | ** Meeting with Hovanes (Slow control) | ||
+ | **: Translation tables [https://halldweb.jlab.org/wiki/index.php/FCAL2_Crates] | ||
* '''Light Monitoring System''' -- Arshak | * '''Light Monitoring System''' -- Arshak | ||
+ | ** [https://userweb.jlab.org/~aasatury/Fcal_LMS/lms_update_march_23.pdf Update on LMS] | ||
* '''Simulations/Analysis''' | * '''Simulations/Analysis''' |
Revision as of 09:17, 24 March 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Available crystals:
- 1450 (modules)
- 32 (ready for fabrication)
- 40 (installed on CCAL) available on March 20
- (some CCAL crystals from the inner part will not be used for the FCAL2)
- 95 expect to receive from CRYTUR in May [1]
- Total 1617
- George (DSG group) finished with disassembling CCAL modules and removing LMS caps. Will work on preshaping ESR reflectors for CRYTUR. The oven will be ready in a week.
- Mindy (DSG group) solder wires to sockets (while waiting for crystals). More crystals will come from the CCAL during next week.
- Available crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1470 (15 modules fabricated since last week)
- Currently available for fabrication: 12
- Fabricated modules: Total 1470 (15 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- FCAL2 modules with dividers installed on the CCAL [2]
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [3]
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Meeting with Hovanes (Slow control)
- Translation tables [4]
- Light Monitoring System -- Arshak
- Simulations/Analysis