Line 9: | Line 9: | ||
**: 1450 (modules) | **: 1450 (modules) | ||
**: 32 (ready for fabrication) | **: 32 (ready for fabrication) | ||
− | **: 40 (installed on CCAL) | + | **: 40 (installed on CCAL) |
**: (some CCAL crystals from the inner part will not be used for the FCAL2) | **: (some CCAL crystals from the inner part will not be used for the FCAL2) | ||
**: 95 expect to receive from CRYTUR in May [https://halldweb.jlab.org/wiki/index.php/CRYTUR ] Expect to start shipping crystals in the 2nd week of April. | **: 95 expect to receive from CRYTUR in May [https://halldweb.jlab.org/wiki/index.php/CRYTUR ] Expect to start shipping crystals in the 2nd week of April. | ||
**: Total 1617 | **: Total 1617 | ||
− | ** Disassemble the CCAL prototype | + | ** Disassemble the CCAL prototype [https://halldweb.jlab.org/detectors/fcal2/installation/photos/ccal_good.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/ccal_remove_lms.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/ccal_spares.jpg] |
** George (DSG group) is unwrapping CCAL modules and removing LMS caps. He'll also work on preshaping ESR reflectors (100 pcs) for CRYTUR. | ** George (DSG group) is unwrapping CCAL modules and removing LMS caps. He'll also work on preshaping ESR reflectors (100 pcs) for CRYTUR. | ||
** Mindy (DSG group) solder wires to sockets (while waiting for crystals). She will continue with crystal wrapping during next week. | ** Mindy (DSG group) solder wires to sockets (while waiting for crystals). She will continue with crystal wrapping during next week. |
Revision as of 09:15, 31 March 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Available crystals:
- 1450 (modules)
- 32 (ready for fabrication)
- 40 (installed on CCAL)
- (some CCAL crystals from the inner part will not be used for the FCAL2)
- 95 expect to receive from CRYTUR in May [1] Expect to start shipping crystals in the 2nd week of April.
- Total 1617
- Disassemble the CCAL prototype [2][3][4]
- George (DSG group) is unwrapping CCAL modules and removing LMS caps. He'll also work on preshaping ESR reflectors (100 pcs) for CRYTUR.
- Mindy (DSG group) solder wires to sockets (while waiting for crystals). She will continue with crystal wrapping during next week.
- Available crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1482
- Currently available for fabrication: 0 (modules will be available during next week)
- Fabricated modules: Total 1482
- Testing of PMT dividers -- Sasha / Arshak
- FCAL2 modules with dividers installed on the CCAL [5]
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [6]
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Meeting with Hovanes (Slow control)
- Translation tables [7]
- Light Monitoring System -- Arshak
- Simulations/Analysis