**: Total 1617 | **: Total 1617 | ||
** Disassemble the CCAL prototype | ** Disassemble the CCAL prototype | ||
− | ::: [https://halldweb.jlab.org/detectors/fcal2/installation/photos/ccal_good.jpg 25 | + | ::: [https://halldweb.jlab.org/detectors/fcal2/installation/photos/ccal_good.jpg 25 All modules removed from the detector] [https://halldweb.jlab.org/detectors/fcal2/installation/photo/ccal_remove_lms.jpg] |
::: [https://halldweb.jlab.org/detectors/fcal2/installation/photos/ccal_spares.jpg Modules installed in the inner part of the CCAL] | ::: [https://halldweb.jlab.org/detectors/fcal2/installation/photos/ccal_spares.jpg Modules installed in the inner part of the CCAL] | ||
− | ** George (DSG group) | + | ** George (DSG group) unwrapped CCAL modules and removed LMS caps. 21 modules are ready for wrapping. Started working on preshaping ESR reflectors (65 pcs) for CRYTUR. |
− | ** Mindy (DSG group) | + | ** Mindy (DSG group) wrapped 17 modules. She continues soldering wires to sockets |
− | ** | + | ** Chris S. is getting quotes for HV and LV cabled. |
− | ** | + | ** Ordered 16,000 ft of optical fibers (need to add 8,000 ft to the PO), discussing delivery schedule. |
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] --> | <!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] --> | ||
** Fabricated modules: <span style="color:#FF0000"> Total 1482 </span> | ** Fabricated modules: <span style="color:#FF0000"> Total 1482 </span> | ||
− | **: Currently available for fabrication: | + | **: Currently available for fabrication: 17 (modules will be available during next week) |
<!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 + 3 SICCAS] --> | <!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 + 3 SICCAS] --> | ||
<!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 834 CRYTUR], available: 1 --> | <!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 834 CRYTUR], available: 1 --> |
Revision as of 08:29, 21 April 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Available crystals:
- 1450 (modules)
- 32 (ready for fabrication)
- 40 (installed on CCAL)
- (some CCAL crystals from the inner part will not be used for the FCAL2)
- 95 expect to receive from CRYTUR in May [1] Expect to start shipping crystals in the 2nd week of April.
- Total 1617
- Disassemble the CCAL prototype
- Available crystals:
- George (DSG group) unwrapped CCAL modules and removed LMS caps. 21 modules are ready for wrapping. Started working on preshaping ESR reflectors (65 pcs) for CRYTUR.
- Mindy (DSG group) wrapped 17 modules. She continues soldering wires to sockets
- Chris S. is getting quotes for HV and LV cabled.
- Ordered 16,000 ft of optical fibers (need to add 8,000 ft to the PO), discussing delivery schedule.
- Module fabrication -- Sasha
- Fabricated modules: Total 1482
- Currently available for fabrication: 17 (modules will be available during next week)
- Fabricated modules: Total 1482
- Testing of PMT dividers -- Sasha / Arshak
- FCAL2 modules with dividers installed on the CCAL [3]
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [4]
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Light Monitoring System -- Arshak
- Simulations/Analysis