Difference between revisions of "Roadmap toward a decision for Bcal Readout"
From GlueXWiki
(→Silicon PM) |
(→Silicon PM) |
||
Line 24: | Line 24: | ||
=== Silicon PM === | === Silicon PM === | ||
*[[Private:SensL SiPMs | SensL SiPMs]] | *[[Private:SensL SiPMs | SensL SiPMs]] | ||
− | *[[Image: | + | *[[Image:SiPM_PDEvsDR_A.pdf | Hamamatsu SiPMs first look 3/16/09]] |
=== Fine Mesh PMT === | === Fine Mesh PMT === |
Revision as of 13:26, 16 March 2009
Contents
Roadmap toward a decision for Bcal Readout
Status and schedules can be found in the report at the Jan collaboration meeting.
- Technical specifications, already outlined in GlueX-doc-795
- Geometry, especially related to acceptance gap between Bcal and Fcal. Detailed plan should be developed.
- Light guides and inactive material is different for the two options. We need to simulate the effect of each
- Precise configuration of light guides for FM pmts on the upstream end, where the field at the end of the Bcal exceeds 0.5 T. See light guides studies.
- Detail description of cables and electronics on each detector
- Granularity.
- Optimization of distribution between inner and outer detectors
- Which detectors should have discriminators and TDCs
- Study of signal splitting, choice of discriminator - has an impact on number of cables.
- Resolution
- Complete simulation studies for correct thresholds for the FM.
- Energy threshold for various assumed PDE and DR combinations.
- Studies of timing resolution. Realistic simulation for both photons and charged particles
- Resolution for various geometry options (mentioned above).
- Detailed B-field plots including dependence on B-field components
- Dynamic range required, especially for near pmt/small angle showers.