Difference between revisions of "JEF meeting, September 6, 2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 20: Line 20:
 
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings]
 
* [https://halldweb.jlab.org/detectors/fcal2/installation/safety_docs/Document_240716_195013-1.pdf Safety briefings]
 
'''Students''' -- Sasha
 
'''Students''' -- Sasha
** - Expect one student from Wuhan, waiting for the US visa
+
* - Expect one student from Wuhan, waiting for the US visa
 
'''Beam tests with the PS'''
 
'''Beam tests with the PS'''
***  measure shower beam profile and reconstruction in the crystal/LG transition region  
+
*  measure shower beam profile and reconstruction in the crystal/LG transition region  
***  (install prototype with 5x5 PbWO4 modules  + ? LG)  
+
*  (install prototype with 5x5 PbWO4 modules  + ? LG)  
 
'''Other hardware projects'''
 
'''Other hardware projects'''
** prototype of the ECAL veto counter (?)
+
* prototype of the ECAL veto counter (?)
 
'''Analysis/Simulation'''
 
'''Analysis/Simulation'''
 
** [https://halldweb.jlab.org/wiki/images/2/22/Sept-6-Status-Update.pdf Update from Laveen]
 
** [https://halldweb.jlab.org/wiki/images/2/22/Sept-6-Status-Update.pdf Update from Laveen]

Revision as of 08:46, 6 September 2024

Meeting time and location:

Agenda

Preparation of parts for ECAL -- Sasha

  • - HV long cable: Sammy and Mindy are finishing up with assembling cables, 2 cables are left
  • - HV distribution boards [1][2]
- 5 (12 x 4) and 5 (6 x 8) boards have been received. Chris checked connections. All remaining PCB boards are expected to be in the lab on Sep 12.
- Chris is finalizing design of the distribution boxes (each box will comprise 9 PCBs). He expects to submit PR during next week.
  • - Fix front panel of two LV distribution boards [3]
- new plates for the LV distribution boards should arrive to JLab during next week. Need to re-install 2 distribution boards and connect cables
  • - LED: Started testing the prototype of the LMS (need to make the detector room light tight)

Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen

  • Installation and testing dividers has been completed [4]
- need to arrange cables on chains
- need to arrange cables on cable trays

Students -- Sasha

  • - Expect one student from Wuhan, waiting for the US visa

Beam tests with the PS

  • measure shower beam profile and reconstruction in the crystal/LG transition region
  • (install prototype with 5x5 PbWO4 modules + ? LG)

Other hardware projects

  • prototype of the ECAL veto counter (?)

Analysis/Simulation