Difference between revisions of "JEF meeting, March 28, 2025"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 10: Line 10:
  
 
'''Preparing for the run''' -- Sasha
 
'''Preparing for the run''' -- Sasha
* Reconfiguring MPODs for LV power supply
+
* Reconfiguring MPODs for LV power supply [https://logbooks.jlab.org/entry/4343709]
 
* Check mapping of ECAL modules
 
* Check mapping of ECAL modules
 
* Final check of the detector
 
* Final check of the detector

Revision as of 08:59, 28 March 2025

Connection

Meeting time and location:

Agenda

Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

Preparing for the run -- Sasha

  • Reconfiguring MPODs for LV power supply [1]
  • Check mapping of ECAL modules
  • Final check of the detector

Restoring PS test setup [2]

Calibrations