Difference between revisions of "Mar 11, 2010 Readout"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 42: | Line 42: | ||
= Minutes = | = Minutes = | ||
Attending: | Attending: | ||
+ | |||
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Update - USM | ||
+ | # Simulation runs | ||
+ | # [http://www.jlab.org/~huttonc/BCAL%20readout%203_11_10.pptx | Geometry] | ||
+ | # SiPM - [[SiPM Radiation Hardness Test]] (Yi) | ||
+ | # SiPM - Testing (Fernando) | ||
+ | #* Planning | ||
+ | #* Test station development with measurement parameters | ||
+ | #* Review & acceptance of test station | ||
+ | #* Preliminary verification tests & analysis of test station | ||
+ | #* Fabrication of two additional test stations for UR and JLab | ||
+ | #* Responsibilties | ||
+ | # SiPM - production testing | ||
+ | #* Schedules | ||
+ | # Light guides |
Revision as of 18:31, 11 March 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
-
Check with Hall B regarding U. of Washington neutron detectors (Elton).Neutron detectors were returned to UofW. - Input/Decisions needed to finalize Bcal readout requirements (See also GlueX-doc-1373).
- Specify the normalization and dynamic range for the number of photons/GeV in showers (Andrei to summarize MC results)
- charged particles should also be included into the evaluation
-
Decide on specific grouping for SiPM sumsWill do this on output of generated showers -
Possibility of using air gap for SiPM coupling to light guide (Elton to write up results) -
Finalize shapes of "Winston guides"Basic information in GlueX-doc-1432.
- Specify the normalization and dynamic range for the number of photons/GeV in showers (Andrei to summarize MC results)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- Simulation runs
- | Geometry
- SiPM - SiPM Radiation Hardness Test (Yi)
- SiPM - Testing (Fernando)
- Planning
- Test station development with measurement parameters
- Review & acceptance of test station
- Preliminary verification tests & analysis of test station
- Fabrication of two additional test stations for UR and JLab
- Responsibilties
- SiPM - production testing
- Schedules
- Light guides
Minutes
Attending:
- Announcements
- Review of Action Items
- Update - USM
- Simulation runs
- | Geometry
- SiPM - SiPM Radiation Hardness Test (Yi)
- SiPM - Testing (Fernando)
- Planning
- Test station development with measurement parameters
- Review & acceptance of test station
- Preliminary verification tests & analysis of test station
- Fabrication of two additional test stations for UR and JLab
- Responsibilties
- SiPM - production testing
- Schedules
- Light guides