Difference between revisions of "Jun 10, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 30: Line 30:
 
# FCAL
 
# FCAL
 
## Construction status
 
## Construction status
## To shashlyk or not to shashlyk. Options (Elton) see Table. Physics Impact, see [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1481 GlueX-doc-1481]
+
## To shashlyk or not to shashlyk.  
## PbWO Insertion.  (Ashot) .  see [http://www.jlab.org/~gasparan/FCAL_INS/Gasparian_GlueX_Phys_meeting_May_24_2010.ppt]
+
 
+
 
# BCAL
 
# BCAL
## Calorimeter input to PAC (Zisis)
 
 
## Construction Status
 
## Construction Status
## Lead: 6th order of 13cm-wide sheets
 
## Fibres: [[Media:FibresAttenLenShips1-12.png]]
 
## Npe corrected numbers: [[Media:ZoomedPage31.png]] and [[Media:ZoomedPage38.png]]
 
##  [http://www.jlab.org/Hall-D/software/wiki/images/b/bb/MPPC_Test_Setup.V2.ppt USM MPPC test stand design update]
 
 
# Simulations
 
# Simulations
 
# Other Updates
 
# Other Updates
 
  
 
=Minutes=
 
=Minutes=
  
 
Attendees:
 
Attendees:

Revision as of 14:00, 1 June 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
    • USM: Send drawings of guides to be machined (soon). Send 4 unpolished guides to UofR and 2 unpolished guides to Athens.
    • Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR/UofA).
  2. Fcal
    • Decision on rad hard detectors
    • Ashot to send type of Hamamatsu pmt used for PRIMEX
    • Elton and Ashot to meet and resolve any discrepancies between the simulations.

Discussion of Options for Radiation-Hard Insert

Options for Radiation-Hard Insert

Tentative Agenda

  1. Announcements
  2. FCAL Fabrication Readiness Review
  3. Review of Action Items
  4. Calibration/Monitoring (Zisis)
  5. FCAL
    1. Construction status
    2. To shashlyk or not to shashlyk.
  6. BCAL
    1. Construction Status
  7. Simulations
  8. Other Updates

Minutes

Attendees: