Difference between revisions of "Dec 9, 2010 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
|||
Line 18: | Line 18: | ||
#* IU: checking cross talk of calibration inputs across modules. | #* IU: checking cross talk of calibration inputs across modules. | ||
# Fcal construction | # Fcal construction | ||
− | #* Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. | + | #* <strike> Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. </strike> |
#* <strike> Lubomir to provide references on radiation damage of lead glass.</strike> | #* <strike> Lubomir to provide references on radiation damage of lead glass.</strike> | ||
#* <strike> JLab decide on disposition of Fcal cables to free up space at IU. </strike> Ship all cables back to JLab for disposition. | #* <strike> JLab decide on disposition of Fcal cables to free up space at IU. </strike> Ship all cables back to JLab for disposition. |
Revision as of 13:32, 9 December 2010
Teleconference Time: 10:30 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Items for followup from previous meeting(s)
- Monitoring
-
Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina) -
IU will provide mechanical drawings to Athens to help design attachment and connection points. - IU: checking cross talk of calibration inputs across modules.
-
- Fcal construction
-
Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. -
Lubomir to provide references on radiation damage of lead glass. -
JLab decide on disposition of Fcal cables to free up space at IU.Ship all cables back to JLab for disposition.
-
- SiPMs
- IU: simulation using geometry for summed units
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- Requirements for BCAL monitoring: summary points and Monitoring System Requirements (Christina, Elton and Zisis)
- FCAL
- Construction Status
- BCAL
- Construction Status
- Simulations
- Readout segmentation (summing, towers vs quadrants/blocks)
- Reconstruction
- Other Updates