Difference between revisions of "Dec 9, 2010 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
|||
Line 25: | Line 25: | ||
= Tentative Agenda = | = Tentative Agenda = | ||
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Calibration | ||
+ | ## Requirements for BCAL monitoring: [http://www.jlab.org/Hall-D/software/wiki/index.php/Dec_06%2C_2010_Calibration/Monitoring summary points] and [[Monitoring System Requirements]] (Christina, Elton and Zisis) | ||
+ | # FCAL | ||
+ | ## Construction Status | ||
+ | # BCAL | ||
+ | ## Construction Status | ||
+ | # Simulations | ||
+ | ## Readout segmentation (summing, towers vs quadrants/blocks) | ||
+ | ## Reconstruction | ||
+ | # Other Updates | ||
+ | |||
+ | =Minutes= | ||
+ | ''Attending: | ||
# Announcements | # Announcements |
Revision as of 13:32, 9 December 2010
Teleconference Time: 10:30 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Items for followup from previous meeting(s)
- Monitoring
-
Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina) -
IU will provide mechanical drawings to Athens to help design attachment and connection points. - IU: checking cross talk of calibration inputs across modules.
-
- Fcal construction
-
Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. -
Lubomir to provide references on radiation damage of lead glass. -
JLab decide on disposition of Fcal cables to free up space at IU.Ship all cables back to JLab for disposition.
-
- SiPMs
- IU: simulation using geometry for summed units
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- Requirements for BCAL monitoring: summary points and Monitoring System Requirements (Christina, Elton and Zisis)
- FCAL
- Construction Status
- BCAL
- Construction Status
- Simulations
- Readout segmentation (summing, towers vs quadrants/blocks)
- Reconstruction
- Other Updates
Minutes
Attending:
- Announcements
- Review of Action Items
- Calibration
- Requirements for BCAL monitoring: summary points and Monitoring System Requirements (Christina, Elton and Zisis)
- FCAL
- Construction Status
- BCAL
- Construction Status
- Simulations
- Readout segmentation (summing, towers vs quadrants/blocks)
- Reconstruction
- Other Updates