− | * Decisions from 21-Dec-2010 meeting | + | * Decisions from 21-Dec-2010 meeting on work to start now |
** minimize summed coil voltage readouts, do most sums in PLC | ** minimize summed coil voltage readouts, do most sums in PLC | ||
*** implement early-warning quench/overvoltage detection in PLC | *** implement early-warning quench/overvoltage detection in PLC |
Revision as of 15:27, 21 December 2010
- Decisions from 21-Dec-2010 meeting on work to start now
- minimize summed coil voltage readouts, do most sums in PLC
- implement early-warning quench/overvoltage detection in PLC
- add separate readouts of splice and vapor-cooled lead voltages using Newport controllers
- can combine splice and lead into one hardware quench/overvoltage protection channel
- match and balance all current-limiting resistors, go back to original 100k Ohm matched resistors
- Danfysik quench detector
- match and balance all resistors
- revert channels used for splice/leads to normal coil balance mode
- install test points for gain/offset tuning
- install pots for external balance
- it is not clear whether this device will work for coil 4
- read out voltage taps for quench detection and DAQ using separate resistor chain
- will not go to active isolation for the upcoming coil, may have to if this doesn't work, and may use this in the hall
- install voltage divider to extend voltage range of USB device readout, rework Zener protection
- minimize summed coil voltage readouts, do most sums in PLC
- Basic questions
- lag between field and current...are there turn-to-turn shorts in coil 1?
- what worked, what didn't for coil 1?
- what should we do differently for the next coil?
- what coil will we test next?
- will we open up coil 4?
- what might we consider doing differently in the hall?
- prioritize into "must-haves", "should-haves" and "would-like-to-haves"
- do we want an independent review of our fast (and slow) dump strategy and system?
- have we documented our experience?
- Puzzles and problems to be addressed before next coil test
- improve cryo system
- minimize ice buildup
- more heating/insulation on N2 vent line
- do we need cold traps?
- do we need additional valves, check valves, bypasses, whatever?
- can we calibrate the C-glass sensors somehow?
- field polarity reversed
- sub-coil inductances appear to be backwards
- measure with inductance meter on the platform
- inductance seen on splices
- USB device wiring problems
- other wiring, cable and connector problems
- better indication of what caused fast/slow dumps -- either LED Panel or bits to the PLC
- total coil inductance disagreement
- use matched current-limiting resistors
- dynamic range adjustments
- noise elimination
- slow dump doesn't work
- understand fast dump circuit
- measure fast dump resistances
- understand Danfysik ramp-down mechanism
- vapor-cooled lead blockage
- can anything be done to avoid another one?
- cold traps to prevent blockage?
- heaters to melt blockage?
- improve ability to adjust quench detector
- bring test points to front panel
- use matched resistors
- will quench detector work for coil 4?
- note that max ramp rate in the hall is 10V / 20H = 0.5 A/sec
- use new sensor for vapor-cooled lead voltage drop
- isolation and current-loop readout for critical signals
- interaction via Zener and Dataforth clipping
- UPS on Danfysik boards and contactor
- improve PLC cryo and MPS algorithms (in preparation for non-expert use)
- simplify many operations
- improve PLC early problem detection
- improve PLC cryo control under varying CTF operating conditions
- add more HMI screens (may need license upgrade)
- simplify existing screens
- relabel readouts
- additional HMI license, get second computer working
- dual-redundant HMI server or another machine for the server
- HMI development machine and license
- contact A-B salesman about licenses
- change HMI database
- more pre-defined trend plots
- did we ever implement guard shack notification?
- automated elog entries
- update drawings and documentation
- where is manpower to make improvements?
- what else?
- improve cryo system