'''To-do list'''
 
'''To-do list'''
 +
  
 
* Wiring
 
* Wiring
 
** checkout, understand noise, signal clipping and interaction between modules
 
** checkout, understand noise, signal clipping and interaction between modules
 +
** eliminiate pickup on downstream lead/splice (esp. during dump)
 +
** understand induced voltages on taps during testing
  
  
 
* Danfysik power supply
 
* Danfysik power supply
 +
** fix broken transistor
 +
** commission fault sequencer
 
** understand ramp-down mechanism
 
** understand ramp-down mechanism
 +
** understand varying fast dump time constants
 
** fix slow dump
 
** fix slow dump
 
** choose ground fault detection compatible with quench detector
 
** choose ground fault detection compatible with quench detector
Line 12: Line 18:
  
 
* Danfysik quench detector
 
* Danfysik quench detector
 +
** implement front-end balancing circuits
  
  
* Dataforth system
+
* Instrumentation
 
+
** ensure all devices on clean power
 
+
** check out Newport controllers, flow switch
* USB device
+
** implement system to isolate fault detectors and determine time sequence of trips
** rework Zener/divider box
+
** understand spikes on shunt Newport
 +
** understand effect of B field on all sensors
 +
** monitor circuit breakers?
  
  
 +
* NI USB device
 +
** rework Zener/divider box, needs to be fully bipolar
 +
** eliminate noise
  
  
 
* A-B HMI improvements
 
* A-B HMI improvements
 
** upgrade to 100 screen license
 
** upgrade to 100 screen license
 +
** implement fault sequence screens
  
  
Line 32: Line 45:
  
 
* EPICS
 
* EPICS
 
  
  
 
* EWEB screens
 
* EWEB screens
 
** update for latest tags and drawings
 
** update for latest tags and drawings
 
  
  

Revision as of 10:58, 10 March 2011

To-do list


  • Wiring
    • checkout, understand noise, signal clipping and interaction between modules
    • eliminiate pickup on downstream lead/splice (esp. during dump)
    • understand induced voltages on taps during testing


  • Danfysik power supply
    • fix broken transistor
    • commission fault sequencer
    • understand ramp-down mechanism
    • understand varying fast dump time constants
    • fix slow dump
    • choose ground fault detection compatible with quench detector


  • Danfysik quench detector
    • implement front-end balancing circuits


  • Instrumentation
    • ensure all devices on clean power
    • check out Newport controllers, flow switch
    • implement system to isolate fault detectors and determine time sequence of trips
    • understand spikes on shunt Newport
    • understand effect of B field on all sensors
    • monitor circuit breakers?


  • NI USB device
    • rework Zener/divider box, needs to be fully bipolar
    • eliminate noise


  • A-B HMI improvements
    • upgrade to 100 screen license
    • implement fault sequence screens


  • A-B PLC program improvements
    • use custom ("add-on") instructions to simplify code


  • EPICS


  • EWEB screens
    • update for latest tags and drawings


For the hall

  • note that max ramp rate in the hall is approximately 10V / 20H = 0.5 A/sec
  • should we install a UPS on the Danfysik contactor and control boards?
  • do we need additional valves, check valves, bypasses, whatever?
  • do we need Dataforth voltage attenuators on coil tap channels?
  • do we need active isolation of coil tap channels, etc?
  • should we monitor all circuit breakers?
  • should we monitor all relays?
  • effect of B field on sensors/relays?