Difference between revisions of "May 26, 2011 Calibration/Monitoring"
From GlueXWiki
Line 18: | Line 18: | ||
= Tentative Agenda = | = Tentative Agenda = | ||
− | # | + | # Paperwork Progress |
# Monitoring system concepts | # Monitoring system concepts | ||
Line 24: | Line 24: | ||
''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)'' | ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)'' | ||
+ | |||
+ | # Paperwork Progress: APP has been finished and SOW as well. | ||
+ | # Monitoring system concepts | ||
+ | #* LED Boards: the different options were discussed, namely ribbon cables vs. flex board between the stiffer LED miniboards etc. | ||
+ | #* Coupling to LGs: |
Revision as of 15:43, 26 May 2011
Teleconference Time: 08:30 CST (Regina) / 10:30 EDT / 16:30 GMT+2 (Athens)
- Connection: ESNET
Background information
- Monitoring R&D issues for the relative gain calibration and monitoring system for the calorimeters and possibly other detector systems.
- Calibration Specifications Table for BCAL, FCAL, TOF and START
- Calibration and Monitoring System Meetings Previous minutes
Action Items
- USM was contacted to expedite the LG shipment to Athens: Athens has requested 15 units, 12 for one side and 3 for the opposing side of the baby cal.
- In the meanwhile, Elton will send 2 Plastic Craft LGs to Athens, and possibly small connectors (from the SiPM U-board) or at least information on the type of connectors for both LED and control board.
- Christina will discuss connectors with Kappos and also whether a 90 degree LED can be used and where it can be mounted.
- Zisis will have Danny sketch the concept for the LED 'channel'.
Tentative Agenda
- Paperwork Progress
- Monitoring system concepts
Minutes
Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)
- Paperwork Progress: APP has been finished and SOW as well.
- Monitoring system concepts
- LED Boards: the different options were discussed, namely ribbon cables vs. flex board between the stiffer LED miniboards etc.
- Coupling to LGs: