Difference between revisions of "Mar 17, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Minutes) |
(→References) |
||
Line 3: | Line 3: | ||
* [http://www.jlab.org/~elton Files for discussion] | * [http://www.jlab.org/~elton Files for discussion] | ||
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1663 Hall D BCAL Readout Mechanical Concept] (Jim Fochtman) | * [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1663 Hall D BCAL Readout Mechanical Concept] (Jim Fochtman) | ||
− | * [[May 27, 2010 Calorimetry | Dynamic Range]] (See section 6 under simulations) | + | * [[May 27, 2010 Calorimetry | Dynamic Range]] (See section 6 under simulations). See also [[Media:Npe Ngamma.pdf | Number of pe and photons]] |
== Action Items from previous meetings == | == Action Items from previous meetings == |
Revision as of 14:23, 12 July 2011
References
- Files for discussion
- Hall D BCAL Readout Mechanical Concept (Jim Fochtman)
- Dynamic Range (See section 6 under simulations). See also Number of pe and photons
Action Items from previous meetings
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- First article testing (Carl and Yi)
- Mechanical cooling (Jim)
- Review status of drawings for prototype (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
- Discussion
Minutes
Attending: Jim, Jack, Elton, Eugene, Carl, Yi, Fernando
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Updated evms table
- First article testing (Carl and Yi)
- Update_20110317
- 27 units out of 80 have been tested.
- Uniformity is very good. Dark rate is about 1 MHz/tile. A single tile has a high dark rate of 1MHz.
- Need to prepare measurements in a magnetic field. Will coordinate with Tom Carstens for testing with coil 3 in test lab.
- Carl mentioned that he thought the pins of the LED might be magnetic. This should be checked
- Mechanical cooling (Jim)
- Review status of drawings for prototype (Chuck)
- All but two drawings are signed, the remaining two should be completed tomorrow. Prototype will go out for construction early next week.
- Temperature compensation (Jack)
- Jack is setting up a dark box for testing his prototype.
- Preamp-summing (Fernando)
- Layout for a single sum section was completed. After duplicating for the rest of the board, the step file will be passed on to Jim to incorporate into the mechanical model.
- Discussion