Line 35: | Line 35: | ||
* Target date to finish construction - 11/02/2011 (Wed) | * Target date to finish construction - 11/02/2011 (Wed) | ||
* Drive from IU to JLab for installation - 11/03/2011 (Thur)~ | * Drive from IU to JLab for installation - 11/03/2011 (Thur)~ | ||
+ | |||
+ | == Beam Rates == | ||
+ | [[File:Hovanes_error1percent.gif|400px|thumb|left|Rates measured on floor with scintillators]] | ||
+ | [[File:UConn_spread.gif|400px|thumb|left|Rates measured on floor with scintillating fibres]] | ||
+ | <br style="clear:both;"/> | ||
+ | * The difference between the two figures seems to stem from the scintillating fibres having | ||
+ | directional dependence on the incoming electrons. Without any veto on the incoming electron | ||
+ | direction, it seems we will be saturated with scattered electrons. | ||
+ | * Also note that these measurements were done near the end of the beam, where there is | ||
+ | lots of scattering as the main beam exits the vacuum. | ||
+ | |||
== Links == | == Links == | ||
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1798 Proposal Document on GlueX docDB] (contains 1 page executive summary) | * [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1798 Proposal Document on GlueX docDB] (contains 1 page executive summary) |
Revision as of 21:01, 11 October 2011
Contents
2011 Hall B FCAL Beam Test
Schedule
Beam
- 2011/11/19 (Sat) beam start
- 11/19/2011 (Sat) 11/20/2011 (Sun) COMMISSIONING
- 11/21/2011 (Mon) 12/04/2011 (Sun) 4446 4 Lin 14
- 12/05/2011 (Mon) 12/18/2011 (Sun) 4446 4 Lin 14
- 12/19/2011 (Mon) 12/21/2011 (Wed) 4446 4 Lin 3
- 12/22/2011 (Thu) 01/03/2012 (Tue) WINTER DOWN
- 01/04/2012 (Wed) 01/13/2012 (Fri) 2528 3 Cir 10 special Hall A Ee
- 01/14/2012 (Sat) 01/24/2012 (Tue) 2254 2 Cir 11
- 01/25/2012 (Wed) 01/26/2012 (Thu) 4446 4 Lin 2 special Hall A
- 01/27/2012 (Fri) 02/10/2012 (Fri) 2254 2 Cir 15
- 02/11/2012 (Sat) 02/24/2012 (Fri) 5542 5 Lin 14
- 02/25/2012 (Sat) 03/09/2012 (Fri) 5542 5 Lin 14
- 03/10/2012 (Sat) 03/23/2012 (Fri) 5542 5 Lin 14
- 03/24/2012 (Sat) 04/06/2012 (Fri) 5542 5 Lin 14
- 04/07/2012 (Sat) 04/14/2012 (Sat) 4446 4 Lin 8
- 04/15/2012 (Sun) 04/16/2012 (Mon) EXCHANGE TARGET, NO BEAM
- 04/17/2012 (Tue) 04/18/2012 (Wed) 4446 4 Lin 2
- 04/19/2012 (Thu) 04/20/2012 (Fri) 4446 4 Lin 2
- 04/21/2012 (Sat) 04/22/2012 (Sun) 4446 4 Lin 2
- 04/23/2012 (Mon) 04/24/2012 (Tue) 5542 5 Lin 2
- 04/25/2012 (Wed) 04/26/2012 (Thu) 5542 5 Lin 2
- 04/27/2012 (Fri) 04/28/2012 (Sat) 5542 5 Lin 2
- 04/29/2012 (Sun) 04/30/2012 (Mon) 5542 5 Lin 2
- 05/01/2012 (Tue) 05/04/2012 (Fri) 2254 2 Cir 4
- 05/05/2012 (Sat) 05/09/2012 (Wed) INSTALL RASTER, SET BEAMLINE, NO BEAM
- 05/10/2012 (Thu) 05/17/2012 (Thu) 2254 2 Lin 8 e+ HD performance tests
- 05/17/2012 (Thu) Start of 12 GEV SHUTDOWN
Construction
- Target date to finish construction - 11/02/2011 (Wed)
- Drive from IU to JLab for installation - 11/03/2011 (Thur)~
Beam Rates
- The difference between the two figures seems to stem from the scintillating fibres having
directional dependence on the incoming electrons. Without any veto on the incoming electron direction, it seems we will be saturated with scattered electrons.
- Also note that these measurements were done near the end of the beam, where there is
lots of scattering as the main beam exits the vacuum.
Links
- Proposal Document on GlueX docDB (contains 1 page executive summary)
- Kei Moriya Talk at GlueX Collaboration Meeting 2011 October@JLab
- Hall B HD-ICE webpage
- Hall B HD-ICE wiki, with link to run schedule
Personnel Available for Datataking
- IU
- Kei Moriya (time centered around November 7th not available due to birth of child)
- Regina