Difference between revisions of "CDC Construction"
From GlueXWiki
(→Fabrication Documentation) |
(→Fabrication Documentation) |
||
Line 29: | Line 29: | ||
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1534 Aluminum Feedthru acceptance checks] | ** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1534 Aluminum Feedthru acceptance checks] | ||
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1442 Assembly Tests Summary] | ** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1442 Assembly Tests Summary] | ||
+ | ** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1862 Wire Tension Measurements] | ||
==== Production Documents ==== | ==== Production Documents ==== |
Revision as of 12:53, 9 November 2011
Contents
The GlueX CDC
Overview
Construction
- CDC Fabrication Readiness Review (Pittsburgh, 21 October, 2010)
- Details of the CDC Construction
- Submitted Monthly Reports
- Log of Construction Complications
- The documentation provided by CMU to Jefferson Lab as part of the CMU Contract Submission.
Fabrication Documentation
- Assembly documents
- Final
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)
- End plate Alignment
- Straw Preparation (clean & trim)
- Glueing Donuts into Straws
- Straw Insertion
- Outer Shell Installation
- Wire Stringing Details
- Summary of Tests
- Document describing the measurement of wire tensions
- Preliminary
- Final
- QA Documents
Production Documents
- Conducting Epoxy Order Schedule
- Final CDC Drawings (original repository, viewable from JLab only)
- Final CDC Drawings (for the later stages of construction)