Difference between revisions of "Photon Beam"
From GlueXWiki
Line 35: | Line 35: | ||
* [[Private:Photon Beam and Tagger Instrumentation Paper (2010)|Photon beam and tagger instrumentation paper (2010)]] | * [[Private:Photon Beam and Tagger Instrumentation Paper (2010)|Photon beam and tagger instrumentation paper (2010)]] | ||
* [http://zeus.phys.uconn.edu/halld/tagger/sow-5-2010/Hall-D%20Tagger%20Dipole%20Magnet%20Specification%204-19-2010.pdf Statement of Work for tagger procurement (2010)] | * [http://zeus.phys.uconn.edu/halld/tagger/sow-5-2010/Hall-D%20Tagger%20Dipole%20Magnet%20Specification%204-19-2010.pdf Statement of Work for tagger procurement (2010)] | ||
+ | * [[Private:Construction contracts | Construction contracts and related info (private)]] | ||
<br> | <br> | ||
* [[Tagged Beam Group Engineering Drawings|engineering drawings]] | * [[Tagged Beam Group Engineering Drawings|engineering drawings]] | ||
* [[Diamond Radiator Assessment with X-rays|diamond radiator assessment]] | * [[Diamond Radiator Assessment with X-rays|diamond radiator assessment]] |
Revision as of 17:51, 9 January 2012
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
- project R&D milestones
- Main Detector Construction Milestons (private)
- instrumentation prototyping
- Nov. 2008 Tagger Review
- Photon beam and tagger instrumentation paper (2010)
- Statement of Work for tagger procurement (2010)
- Construction contracts and related info (private)