Difference between revisions of "Feb 14, 2012 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 106: | Line 106: | ||
## [[BCAL Beam Tests 2012]] | ## [[BCAL Beam Tests 2012]] | ||
# USM update | # USM update | ||
− | ## [https://halldweb1.jlab.org/wiki/images/6/6f/Report_6.pdf Run manager report] | + | ## [https://halldweb1.jlab.org/wiki/images/6/6f/Report_6.pdf Run manager report (Javiera)] |
+ | ## [https://halldweb1.jlab.org/wiki/images/2/2c/02_14_my_pres_Hall-D.pdf Update on Station 3 (Hayk)] | ||
# TDR update | # TDR update | ||
## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). | ## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). |
Revision as of 11:37, 14 February 2012
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
- Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication
- TDR
-
Create outline to assign writing homework (Elton)
-
Draft outline
Existing (old) outline
- Global Design
- Forward Calorimeter
- The E852 Experience
- The RadPhi Experience
- Estimating the GlueX pi0 and eta Mass Resolution
- Electromagnetic Backgrounds
- Radiation Damage
- Heat Curing of Damaged Blocks
- Assessing Lead Glass Blocks and PMT's
- Lead glass block evaluation
- PMT Evaluation
- Other Issues
- Electromagnetic Rates in the LGD
- Magnetic Shielding
- Monitoring
- Calibration
- Triggering
- Barrel Calorimeter
- Design Considerations
- Pb/Sci Barrel Calorimeter
- The GlueX BCAL
- Construction of Prototype Modules
- Production of Lead Sheets
- Module Construction
- Scintillating Fiber Tests
- Fiber Light Transmission Tests
- Silicon Photomultiplier Test
- Upstream Photon Veto
Proposed outline for revised section
- Global Design
- Forward Calorimeter
- Geometry
- Lead Glass Modules
- Lead glass
- Photomultiplier tubes
- Light guide design
- Module assembly
- Support structure
- Stacking
- Calibration
- Monitoring
- Triggering
- Expected Performance
- The E852 Experience
- The RadPhi Experience
- Background, lifetime and rates
- Energy and time resolution
- Mass resolution (+ other physics quantities)
- Barrel Calorimeter
- Geometry
- BCAL Module construction
- Scintillating fibers
- Lead
- Fabrication
- Readout
- SiPMs
- Operation (e.g. temp compensation etc)
- Calibration
- Monitoring
- Expected Performance
- Prototypes and tests
- Background, lifetime and rates
- Energy and time resolution
- Mass resolution (+ other physics quantities)
Tentative Agenda
- Announcements
- Review of Action Items
- Collaboration Meeting
- Friday at 2:30pm, 4 30 minute talks.
- Monitoring.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- Beam tests in Hall B (John)
- BCAL
- USM update
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. See above for old and new proposed outlines.
- Simulations/Reconstruction
- Any other business
Minutes
Attending: