Difference between revisions of "May 24, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Tentative Agenda) |
||
Line 14: | Line 14: | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
# Beam test experience (Elton) | # Beam test experience (Elton) | ||
− | |||
− | |||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
# Mechanical assembly (Scot) | # Mechanical assembly (Scot) | ||
Line 23: | Line 21: | ||
# Preamp-summing (Chris) | # Preamp-summing (Chris) | ||
# Light guide gluing setup | # Light guide gluing setup | ||
− | |||
− | |||
#* Wrapping for light guides | #* Wrapping for light guides | ||
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: |
Revision as of 15:13, 23 May 2012
Action Items from previous meetings
- Determine if swapped bias pins was accidental or in design (Chris)
- Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
- Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
- Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
- Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
- Review Fcal LED and controller monitoring boards (Fernando)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- Beam test experience (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris)
- Light guide gluing setup
- Wrapping for light guides
Minutes
Attending: