Difference between revisions of "Hodoscope Fabrication Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Microscope Information)
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Date and Time ==
 
== Date and Time ==
February 7, 2013
+
June 11, 2013
  
 
== Video Connection information if needed ==
 
== Video Connection information if needed ==
Line 18: Line 18:
 
* Fernando Barbosa (Hall D eletrical engineer)
 
* Fernando Barbosa (Hall D eletrical engineer)
 
* Eugene Chudakov (Hall D group leader)
 
* Eugene Chudakov (Hall D group leader)
* Hovanes Egiyan (Hall D Staff)
+
* William Crahen (Hall D engineer)
 
* Bruce Lenzer (JLab ESH&Q)
 
* Bruce Lenzer (JLab ESH&Q)
 +
* Mark Ito (Hall D Staff)
 
* Elton Smith (Hall D Staff)
 
* Elton Smith (Hall D Staff)
 
* Alexander Somov (Hall D Staff, SOTR)
 
* Alexander Somov (Hall D Staff, SOTR)
 
* Timothy  Whitlatch (Hall D engineer)
 
* Timothy  Whitlatch (Hall D engineer)
* Igor Senderovich (ASU postdoc, formerly in UConn group)
+
 
 
* Jarrod Fitzpatrick (CFO)
 
* Jarrod Fitzpatrick (CFO)
  
Line 30: Line 31:
  
 
== Documents on the Microscope Construction ==
 
== Documents on the Microscope Construction ==
* [https://docs.google.com/folder/d/0B23YqcbK4xUxc2ZEaFU1c0VsSG8/edit?usp=sharing Folder with UConn walk-through videos and presentations]
+
 
* [http://zeus.phys.uconn.edu/wiki/index.php/Full_Scale_Tagger_Microscope_Drawings Drawings (wiki)] Short list of updated drawings:
+
** [http://zeus.phys.uconn.edu/~mcintyre/Repository/TAGM/TAGM-Full-Dwg-1-16-2013.dwg Full detector (AutoCAD)]
+
** [http://zeus.phys.uconn.edu/~mcintyre/Repository/TAGM/TAGM-Top-Enclosure-1-16-2013.dwg Upper (optical) enclosure (AutoCAD)]
+
** [http://zeus.phys.uconn.edu/~mcintyre/Repository/TAGM/TAGM-Bottom-Enclosure-1-16-2013.dwg Lower (electronics) enclosure (AutoCAD)]
+
* [http://zeus.phys.uconn.edu/wiki/index.php/Microscope_Electronics Electronics (wiki)]
+
** [http://zeus.phys.uconn.edu/wiki/index.php/SiPM_digital_control_board Control board overview (wiki)]
+
** [http://zeus.phys.uconn.edu/wiki/index.php/SiPM_Amplifier_Components Schematic of prototype amplifier board (wiki)]
+
** [http://zeus.phys.uconn.edu/wiki/images/PreampV2.0-SmartPDF.pdf Altium drawings of amplifier board 2.0 (pdf)]
+
* [http://zeus.phys.uconn.edu/wiki/index.php/Tagger_Microscope_%26_Active_Collimator_Construction Microscope construction (wiki)]
+
* [http://zeus.phys.uconn.edu/wiki/index.php/Preparations_for_Construction_of_the_Full-Scale_Tagger_Microscope Preparation for Construction: workshop space, instrumentation 1 (wiki)]
+
* [http://zeus.phys.uconn.edu/wiki/index.php/Construction_Phase Construction instrumentation 2 (wiki)]
+
  
 
== Meeting Agenda ==
 
== Meeting Agenda ==
* 9:00  Tour of the Construction Facilities (UConn).
+
* 13:00  Tour of the Construction Facilities (UConn).
  
 
* 10:00  [[Media:scope_readiness_review.pdf | Project Overview]]
 
* 10:00  [[Media:scope_readiness_review.pdf | Project Overview]]

Revision as of 10:07, 7 June 2013

Date and Time

June 11, 2013

Video Connection information if needed

JLab Conference Room L102

  • ESNET and EVO session
  • Phone only if requested:
    • +1-866-740-1260 : US
    • access code: 3421244# (remember the "#"). Phone line by request only.

Participants

CUA

  • Franz Klein (Professor of Physics)


JLab

  • Fernando Barbosa (Hall D eletrical engineer)
  • Eugene Chudakov (Hall D group leader)
  • William Crahen (Hall D engineer)
  • Bruce Lenzer (JLab ESH&Q)
  • Mark Ito (Hall D Staff)
  • Elton Smith (Hall D Staff)
  • Alexander Somov (Hall D Staff, SOTR)
  • Timothy Whitlatch (Hall D engineer)
  • Jarrod Fitzpatrick (CFO)

Topics/Issues that need discussion/resolution

Documents on the Microscope Construction

Meeting Agenda

  • 13:00 Tour of the Construction Facilities (UConn).
  • 10:00 Project Overview
    • Scope of contract and current review
    • Status of construction
  • 10:30 Technical Documents Review. Topics to be covered in going through the documents include the following.
    • Final Construction Plan and Facilities
    • Testing procedures
    • Quality Assurance Plans and Acceptance Test Plans
    • Documentation and Travelers
    • Personnel training
    • Schedule and Tracking
  • 1:00 Video meeting with Jlab and UConn Financial people.
    • Billing and Reporting
  • 2:00 Continue Document Review (if needed).
  • 2:30 Closeout
  • 3:00 Adjourn

Contract Related Documents

(use gluex account to access files)

Construction Plan

Quality Assurance and Acceptance Test Plan